117R-21: Integrated Cost and Schedule Risk Analysis and Contingency Determination Using Combined Parametric Modelling and Monte Carlo Simulation of a CPM Model [August 15, 2022]

117R-21: Integrated Cost and Schedule Risk Analysis and Contingency Determination Using Combined Parametric Modelling and Monte Carlo Simulation of a CPM Model
AACE International, August 15, 2022

Price: $0 (Member) / $100 (Non-Member)
1-CLICK DOWNLOAD FOR MEMBERS


This recommended practice (RP) of AACE International defines the general practices and considerations for combining parametric and CPM-based methods for risk analysis and contingency assessment in construction-based projects. These integrated cost and schedule risk analysis (ICSRA) methods can be combined provided steps are taken to avoid double-counting sources of risk.

The RP defines the combination of the two methodologies to avoid double-counting of risk, not the source methodologies themselves. For those, refer to AACE RP 42R-08 and to AACE RP 57R-09.