(PM-3407) Challenges for Cost Control in Operations in Peruvian Small Companies of Construction Presentation: 0.1 CEU Gloria Luz Flores Fernandez, 23 min 28 sec
(PM-3470) Human Factors in Project Planning and Management: Suggestions for Improvement Presentation: 0.1 CEU Michael O. Onotano, EVP, 61 min 0 sec
(PM-3553) (Presentation Only) How to Create World Class Project Management Organization? Presentation: 0.1 CEU Dr. Nick J. Lavingia, PE, 32 min 33 sec
(PM-3586) (Presentation Only) Palms Up – A Servant Leadership approach for Project Management and Support Presentation: 0.1 CEU Richard C. Plumery, EVP, 66 min 14 sec
(PS-3400) Managing Contractor Schedule Submittals with Higher Efficiency Presentation: 0.1 CEU Thomas Polen, 42 min 24 sec
(PS-3401) Crashing the Schedule Without Losing Track of Reality Presentation: 0.1 CEU Jarod M. Maloney, 45 min 49 sec
(PS-3427) Successful Design Scheduling Presentation: 0.1 CEU Christopher W. Carson, CEP DRMP PSP FAACE, Aaron Fletcher, PSP, Noah A. Jones, PSP, Leo Carson-Penalosa, 69 min 31 sec
(PS-3428) Ramifications of Owner’s Baseline Schedule Approval Decisions Presentation: 0.1 CEU Christopher W. Carson, CEP DRMP PSP FAACE, Gino Napuri, EVP, 58 min 42 sec
(PS-3440) When is a Baseline Not a Baseline? Problems and Solutions of Using the P6 Baseline Function Presentation: 0.1 CEU Beatrice Nasui, Ronald M. Winter, PSP FAACE, 49 min 23 sec
(PS-3473) Essential Factors to Consider in Reviewing Construction Schedules Presentation: 0.1 CEU John Jackson, Melissa Wallace, 23 min 38 sec
(PS-3493) Improve Planning and Decision-Making Using Advanced Schedule and Reporting Management Presentation: 0.1 CEU Amy C. Nelson, Siddharth Patel, Satinder S. Baweja, CCP, 64 min 20 sec
(PS-3496) Interpreting Logic Paths in Multi-Calendar Project Schedules Presentation: 0.1 CEU Thomas M. Boyle, PE PSP, Patrick M. Kelly, PE PSP, 70 min 23 sec
(PS-3554) Introducing a New Critical Path Concept: The Most Labor Manhours Critical Path Presentation: 0.1 CEU Mostafa AbdelRazik, EVP PSP, 20 min 5 sec
(PS-3555) A Practical Application of Identifying and Correcting P6 Corrupt Data Presentation: 0.1 CEU Ronald M. Winter, PSP FAACE, Marina G. Sominsky, PSP, 31 min 22 sec
(PS-3584) Gap Analysis: Recommended Practices vs. TCM Framework Presentation: 0.1 CEU Jessica Colbert, PSP, John P. Orr, PSP FAACE, 50 min 27 sec
(RISK-3457) The Lewis and Clark Expedition's Integrated Cost, Schedule, and Risk Analysis Presentation: 0.1 CEU Robert G. Fatzinger, CEP, Adam James, 32 min 49 sec
(RISK-3479) Variability in Accuracy Ranges: A Case Study in the US and Canadian Power Industry Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, Don Clark, Krishnamurthy Sastry, Bob Yong Kim, Steven Holmes, William Derrick Allman, Kevin Tong, Carlos Ruiz, Ryan Dixon, Kelman K. Ng, P.Eng., Dennis R. Raber, Deborah Sapp, 43 min 52 sec
(RISK-3492) Utilizing Scenario Planning on the Risk Assessment Exercise for High Complexity Projects Presentation: 0.1 CEU Abbas Shakourifar, PSP, Micah J. Meads, 51 min 37 sec
(RISK-3524) Risk Assessment of a Pipeline Construction Project in Alberta During El Niño Year Presentation: 0.1 CEU Mohamed Abdelgawad, D. Anthony Payoe, Guy Krepps, P.Eng., 48 min 58 sec
(RISK-3540) Conditional Branching Models How Project Managers Typically React to Schedule Overruns Presentation: 0.1 CEU Dr. David T. Hulett, FAACE, Michael Trumper, 87 min 3 sec
(TCM-3331) Association of Engineering Design Quality and Project Performance Presentation: 0.1 CEU Dr. James T. O'Connor, Jeyoung Woo, 40 min 59 sec
(TCM-3430) Cost Engineering Roles & The Project Lifecycle: Providing A Framework Presentation: 0.1 CEU Nicole Johnson, CEP, Stephanie Kers, Dave Kyle, CCP CEP, 53 min 8 sec
(TCM-3439) Building Cost Engineering Competence for Public Projects Presentation: 0.1 CEU Mark C. Sanders, PE CCP CFCC PSP, Cristiam Castillo Ortiz, Mayli Salinas Luciano, PSP, 39 min 48 sec
(TCM-3446) Integrated Project Controls Presentation: 0.1 CEU Satinder S. Baweja, CCP, Lori D. Vidak, 65 min 1 sec
(TCM-3468) Integrating Procurement with Project Controls is Critical for Cost Management Presentation: 0.1 CEU Christopher W. Ronak, 36 min 57 sec