(PS-1595) AACE International Recommended Practice 78R-13, Baseline Schedule Review - As Applied in Engineering, Procurement, and Construction Presentation: 0.1 CEU Ronald M Winter PSP, 94 min 23 sec
(PS-1597) Construction Progress Measurement Tool for Small Projects Presentation: 0.1 CEU Syd Daneshyar , Peter Walker, 38 min 42 sec
(PS-1604) Lean Construction Planning Implementation Presentation: 0.1 CEU Hannah E Schumacher PSP , Donna J. Nardella, PE EVP PSP, 62 min 53 sec
(PS-1617) Origin, Theory and Application of the “T-week” Scheduling Process Presentation: 0.1 CEU Jared M. Neumeier PSP, 60 min 22 sec
(PS-1642) Successful Use of Priority-Driven Resource Leveling in P6 Presentation: 0.1 CEU Greg M. Hall, 59 min 17 sec
(PS-1660) Is CPM Scheduling a Problem -- Have We Forgotten The Process? Presentation: 0.1 CEU Robert M. Freas, Ketan S. Tipnis, 50 min 47 sec
(PS-1691) Calculating the As-Built Critical Path Presentation: 0.1 CEU Andrew Avalon, PE PSP, 51 min 13 sec
(PS-1720) Benefits of an Effective Construction Manager’s Shadow Schedule Presentation: 0.1 CEU Hector Arias, Alberto Martinez, Efe Eray Tuncay, 47 min 43 sec
(PS-1739) Reviewing Means of Calculating Schedule Updates with Out-of-Sequence Progress Presentation: 0.1 CEU Dr Fredric L. Plotnick PE, 65 min 34 sec
(RISK-1504) Critical Decision Making for Project Planners and Controllers Presentation: 0.1 CEU Mr. Frank Parth PMP, 54 min 28 sec
(RISK-1522) Construction Risk Estimating and Management Presentation: 0.1 CEU Daniel Holzman CCP, 62 min 31 sec
(RISK-1544) Risks Associated with Concession-Based Contracts in Lagos State, Nigeria Presentation: 0.1 CEU Godwin Jagboro, Grace Kehinde Ojo, Akintayo Opawole, Gabriel Akindoyin Sani, 65 min 31 sec
(RISK-1574) Managing Risks in Supplier Design Integration Presentation: 0.1 CEU Richard C Plumery EVP, 56 min 4 sec
(RISK-1584) Risk Analysis at the Edge of Chaos Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, 58 min 1 sec
(RISK-1594) The Flaw of Averages and the Use of Statistical Tools in Project Environment Presentation: 0.1 CEU Thiago Henriqe Rezende Medeiros, Rafael Gonalves Monteiro, 27 min 48 sec
(RISK-1626) Uncertainty Assessment of Business Plans Using Monte Carlo Simulations Presentation: 0.1 CEU Antoine de Chillaz, Bruno N. Rodrigues, 29 min 27 sec
(RISK-1639) Building an Enterprise Risk Management Program Presentation: 0.1 CEU David Huter, Tooran Khosh PE, Nicholas Johnson PE , Michael Thomas Watry, 58 min 55 sec
(RISK-1662) Using Stochastic Optimization to Improve Risk Mitigation Presentation: 0.1 CEU Eric Druker, Graham Gilmer, Dr. David T. Hulett , 43 min 26 sec
(RISK-1684) Schedule Review of the Risk Model for Pipeline Projects Presentation: 0.1 CEU Gregory J. Whiteside CCP, 45 min 39 sec
(RISK-1698) Integrating with Project Schedule Risk Improves Analysis of Cost Risk Presentation: 0.1 CEU Dr. David T. Hulett , Eric Druker, 65 min 16 sec
(RISK-1721) Variability in Accuracy Ranges: A Case Study in the Canadian Hydropower Industry Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, Raminder S. Bali, P.Eng., John M. Boots, P.Eng., Chantale Germain, P.Eng., Michel Guevremont, P.Eng. PSP, Kelman Kai-man Ng, P.Eng., 61 min 43 sec
(RISK-1763) Planning and Estimating Risky Projects: Oil and Gas Exploration Presentation: 0.1 CEU Colin H. Cropley, Matthew D. Dodds, Grant Christie, 58 min 58 sec
(RISK-1764) AACE International Recommended Practice 67R-11: Contract Risk Allocation - As Applied in Engineering, Procurement, and Construction Presentation: 0.1 CEU James E. Arrow FRICS DRMP, 57 min 52 sec