(BIM-2334) Life Cycle Cost Analysis: Performance Measurement and the Role of Project Controls Presentation: 0.1 CEU Dr Nakisa Alborz , 59 min 3 sec
(BIM-2340) Use of BIM for Asset Management in North American Airports Presentation: 0.1 CEU Dr. Tamera L. McCuen, Dr. Dominique Pittenger, 45 min 30 sec
(CDR-2114) Structuring Construction Claim Investigation Processes to Reduce Cognitive Bias Presentation: 0.1 CEU Dr. Amin Terouhid, DRMP PSP, Dr. Maryam Mirhadi Fard, PSP, 54 min 3 sec
(CDR-2181) Proving Loss of Efficiency and Extra Work Claims Presentation: 0.1 CEU Robert M. Freas, Muhammad Khedr, PSP, 69 min 17 sec
(CDR-2183) The CALDARERA FORMULA™ Calculating the Daily Rate of the Contractor Presentation: 0.1 CEU Joseph V. Caldarera, PSP, 51 min 13 sec
(CDR-2192) Different Allocation Methods for Indirect Costs Presentation: 0.1 CEU William C. Schwartzkopf, Cory R. Milburn, PSP, 35 min 11 sec
(CDR-2211) Finding the Elusive Measured Mile: Unconventional Case Studies Presentation: 0.1 CEU Dr. Tong Zhao, PE PSP, J. Mark Dungan, 62 min 44 sec
(CDR-2212) Choosing the Most Appropriate Schedule Analysis Method Presentation: 0.1 CEU Andrew Avalon, PE PSP, 62 min 55 sec
(CDR-2235) Retrospective TIAs - Is There a Better Way? Presentation: 0.1 CEU John C. Livengood, CCP CFCC PSP FAACE, 65 min 54 sec
(CDR-2236) Mixed Forensic Schedule Analysis Methodologies – Proceed With Caution Presentation: 0.1 CEU Roger Nelson, PE PSP, John C. Livengood, CCP CFCC PSP FAACE, 61 min 13 sec
(CDR-2291) Contemporaneous Understanding of Criticality: Definitions and Application in Forensic Schedule Analysis Presentation: 0.1 CEU Patrick M. Kelly, PE PSP, 59 min 29 sec
(CDR-2305) Implementing the Half-step Update to Improve Project Schedule Controls Presentation: 0.1 CEU John J. Ciccarelli, PE CCP PSP FAACE, Michael J. Bennink, PE CCP PSP, Brian J. Furniss, PE CFCC PSP, 61 min 59 sec
(CDR-2344) Of Quantum Shades of Gray - A Dilemma for the Expert Witness Presentation: 0.1 CEU Jeffery L. Ottesen, PE CFCC PSP, Kenji P. Hoshino, CFCC PSP, Greta A. Martin, PE PSP, 53 min 36 sec
(CSC-2107) Using Historic Data to Improve Monte Carlo Prediction of Project Outcomes Presentation: 0.1 CEU W. Craig Boudreau, P.Eng. CCP, 39 min 22 sec
(CSC-2137) An Overview of Cost Forecasting of Construction Contracts Presentation: 0.1 CEU Syd Daneshyar, P.Eng. CCP, A. Hagire Emrani, 46 min 12 sec
(CSC-2145) Control Mega Projects Using Breakdown Structures Presentation: 0.1 CEU Mathijs van den Berg, CCT, 42 min 51 sec
(CSC-2157) Effective Lump Sum Contracting Project Control on Major Capital Projects Presentation: 0.1 CEU Moses Y. Nkuah, CCP EVP, Charles Mensah, CCP, 62 min 50 sec
(CSC-2168) From Data to Wisdom in Projects Monitoring and Control Presentation: 0.1 CEU Dr. Mohamed E. El-Mehalawi, 57 min 56 sec
(CSC-2179) Ongoing Projects: Forecasting Total Project Cost Using Bottom Up Approach and EV Presentation: 0.1 CEU Firdawos A. Fauzi, M. Fadhil Samat, 44 min 41 sec
(CSC-2277) The Dimensionality of Cost Control Presentation: 0.1 CEU Anne E. Alvarado, CCP, 54 min 39 sec
(CSC-2329) Non-Technical Aspects of Data Integration Presentation: 0.1 CEU Anton W. van der Steege, CCP, 54 min 43 sec
(CSC-2348) (Panel Discussion) Project Controls in the Energy & Utility Sector Presentation: 0.1 CEU Jeffery J. Borowicz, CCP CEP PSP, Anthony M. Woodrich, CCP, 60 min 58 sec
(DEV-2136) Planning Engineer Qualification Parameters Presentation: 0.1 CEU Dr. Ali A. Shash, Mohammad Ibrahim Diab Atmeza, 34 min 18 sec
(EST-2099) A Tale of Two Tails: Chaos in Estimating Predictability Presentation: 0.1 CEU Alexander M. Ogilvie, 61 min 58 sec
(EST-2131) Comparing and Reconciling Joint Venture Estimates Presentation: 0.1 CEU Paul M. Hewitt, Adam S. Hewitt, CCT, 70 min 48 sec