(PM-2237) A Template for EPC Project Management and Execution Presentation: 0.1 CEU Richard P. Helper, PSP, William J. Mihelich, 51 min 32 sec
(PM-2297) Successfully Front End Loading a Condensed Schedule Driven Project Presentation: 0.1 CEU Alexander R. Olson, CCT CST, James E. Krebs, PE CCP FAACE, 55 min 11 sec
(PM-2315) UAV/Drone Use in Construction: Case Studies and Best Practices Presentation: 0.1 CEU Paul Levin, PSP, Neil D. Opfer, CCP CEP PSP FAACE, 68 min 42 sec
(PS-2105) Performing Schedule Analysis and Productivity Using Linear Scheduling Presentation: 0.1 CEU Greg M. Hall, PSP, Abbas Saifi, 54 min 47 sec
(PS-2127) CPM Really Gets Interesting When You Consider Activity Status Presentation: 0.1 CEU Ronald M. Winter, PSP FAACE, 58 min 8 sec
(PS-2134) Avoiding CPM Schedule Mismanagement: Maximize Uses without Compromising Integrity Presentation: 0.1 CEU Jessica Colbert, PSP, 51 min 30 sec
(PS-2138) P6 File Corruption Presentation: 0.1 CEU Ronald M. Winter, PSP FAACE, Marina G. Sominsky, PSP, 57 min 58 sec
(PS-2171) RTFC – Preparing Project Contract or Baseline Schedules Presentation: 0.1 CEU Edward E. Douglas, III CCP PSP FAACE Hon. Life, 62 min 58 sec
(PS-2191) Essential Specification Guidelines for Oracle® Primavera P6™ Presentation: 0.1 CEU Charlie Jackson, PSP, Hannah E. Schumacher, PSP, 62 min 6 sec
(PS-2231) Top 10 Missteps in EPC Scheduling Specifications Presentation: 0.1 CEU Cynthia Hanson, PSP, Scott Bean, PSP, 49 min 14 sec
(PS-2243) Planning and Scheduling Requirements of Subway Station Rehabilitation/Renovation Projects Presentation: 0.1 CEU Dr. Maryam Mirhadi Fard, PSP, Dr. Amin Terouhid, DRMP PSP, 62 min 46 sec
(PS-2262) Using the GAO Scheduling Best Practices to Improve Schedules Presentation: 0.1 CEU Brian M. Evans, DRMP EVP PSP, Katherine K. Evans, 43 min 43 sec
(PS-2267) Developing Cash Flows through Primavera CPM Schedules Presentation: 0.1 CEU Matthew Marzilli, PSP, 42 min 48 sec
(PS-2286) Last Planner System and the Construction Project Schedule Presentation: 0.1 CEU Dr. Heather Eilers, Matthew Morrow, Will Parco, 62 min 30 sec
(PS-2292) When Measuring Delays, Negative Float Doesn't Matter! Presentation: 0.1 CEU Mark F. Nagata, PSP, Bryan Van Lenten, PE, 55 min 42 sec
(PS-2324) Evaluating CPM Schedules for Best Practices: A First Principles Approach Presentation: 0.1 CEU J. Gerard Boyle, Andrii Podolny, Dr. Wail Menesi, 77 min 23 sec
(RISK-2016S2) (Presentation Only) Estimate Accuracy: Dealing with Reality Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, 46 min 4 sec
(RISK-2130) An Introduction to 77R‐15: Quality Control/Quality Assurance for Risk Management Presentation: 0.1 CEU David C. Brady, P.Eng. DRMP, Dr. Alexia A. Nalewaik, CCP FAACE, 56 min 5 sec
(RISK-2142) The Monte Carlo Method for Modeling & Mitigating Systemic Risk Presentation: 0.1 CEU Dr. David T. Hulett, FAACE, Waylon T. Whitehead, 64 min 55 sec
(RISK-2196) Removing the Early-Dates Bias in CPM Risk Analysis Presentation: 0.1 CEU Dr. Gui Ponce de Leon, PE, Dr. Vivek Puri, 53 min 4 sec
(RISK-2238) Risk Mitigation in EPC Projects of Fossil-Fuel Power Plants Presentation: 0.1 CEU Paul Alexander Villanueva, PE CCP, Jeancarlo Duran Maica, CCP EVP, 58 min 24 sec
(RISK-2249) Practical Integration of Risk Management and Quality Management Processes Presentation: 0.1 CEU David A. Norfleet, CCP CFCC DRMP, 52 min 46 sec
(RISK-2342) (Panel Discussion) An Interviewing and Risk Analysis Process for a Risk Workshop Presentation: 0.2 CEU Dr. David T. Hulett FAACE, Eric Ho, Christopher W. Carson, CEP DRMP PSP FAACE, David C. Brady, P.Eng. DRMP, 123 min 10 sec
(TCM-2110) Strategic Portfolio Management: Improving Capital Utilization and Competitive Advantage Presentation: 0.1 CEU Melissa Pruneau, H. Lance Stephenson, CCP FAACE, 60 min 38 sec
(TCM-2112) An Owner’s Approach to Total Cost Management on Superfund Closures Presentation: 0.1 CEU James Wolf, CCP, 41 min 47 sec