(RISK-2441) Integrated Cost-Schedule Risk Analysis Using Monte Carlo Simulation Presentation: 0.1 CEU Dr. David T. Hulett FAACE, 63 min 26 sec
(RISK-2442) Numerical Bias of Risk Teams vs. Project Actual Bid Results Presentation: 0.1 CEU David A. Hamilton, PE CCP, 59 min 36 sec
(RISK-2445) Risk and Uncertainty Practices in GAO’s Best Practice Guides Presentation: 0.1 CEU Karen Richey, Jason T. Lee, 57 min 10 sec
(RISK-2459) (Panel Discussion) DRM Special Track on Quantification Methods Presentation: 0.2 CEU James E. Arrow, DRMP, Colin H. Cropley, Dr. David T. Hulett, FAACE, John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, 121 min 12 sec
(RISK-2470) From Activity-Based Ranging to Risk Driver Approach Presentation: 0.1 CEU Craig Veteto, 57 min 58 sec
(RISK-2473) Lessons Learned in Completing a Tailored Project Risk Management Assessment Tool Presentation: 0.1 CEU Bryan A Skokan PE CCP, Connie (Wei) Liu, Rodney Lehman, Jake Lefman, Dan Melamed CCP EVP , 51 min 46 sec
(RISK-2488) A Rationale for Lean Models for Quantitative Schedule Risk Analyses Presentation: 0.1 CEU Luis O. Figueroa, 55 min 20 sec
(RISK-2505) Fully Integrated Cost Schedule Model – A Stochastic Alternative Presentation: 0.1 CEU Liwen Ren, Gustavo Vinueza C., 41 min 53 sec
(RISK-2510) Modelling Realistic Outcomes Using Integrated Cost and Schedule Risk Analysis Presentation: 0.1 CEU Colin H. Cropley, 47 min 44 sec
(RISK-2511) Role of Project Novelty, Execution and Bias in Risk Quantification Presentation: 0.1 CEU Dr. Yuri Raydugin, P.Eng., 64 min 6 sec
(RISK-2515) Realistic and Practical Project Risk Quantification (without CPM) Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, 57 min 16 sec
(RISK-2516) Variability in Accuracy Ranges: A Case Study in the Canadian Power Transmission Industry Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, Andrea Almeida, P.Eng., Raminder S. Bali, P.Eng., John M. Boots, P.Eng., Kevin Burnham, Victor Hsieh, Qaiser Iqbal, P.Eng., Donald Konan, P.Eng., Guillaume Lafortune, P.Eng., Joe Ly, Clement Wu, P.Eng., 56 min 53 sec
(RISK-2523) Application of Chaos in Megaproject Risk Analysis Models Presentation: 0.1 CEU Jin Feng, Xiang Wenwu, Zhang Bochen, 28 min 22 sec
(RISK-2555) Contingency Cage Match: Simultaneous Contingency Assessment Methods, A Case Study Presentation: 0.1 CEU Matthew Schoenhardt, P.Eng., Vachel Pardais, 56 min 29 sec
(RISK-2570) An Engineering Approach to Schedule Risk Assessment Presentation: 0.1 CEU Angela Tuffley, Adrian Pitman, Dr. Elizabeth Clark, 59 min 9 sec
(RISK-2592) Integrated Cost/Schedule Risk Analysis for Pre-Concept Alternatives Analysis/Technology Selection Presentation: 0.1 CEU Samuel Steiman, PE, Molly Donovan, 67 min 14 sec
(RISK-2596) Backward-Looking Schedule Risk Analysis - Determining Acceptable Variability in Project Start Presentation: 0.1 CEU Molly Donovan, Samuel Steiman, PE, 48 min 34 sec
(RISK-2694) An Innovative Approach to Escalation Risk Mitigation Presentation: 0.1 CEU Warren Fletcher, 54 min 33 sec
(RISK-2700) Quantitative Cost Risk Analysis at Bid Stage Presentation: 0.1 CEU Didier Lagrange, 39 min 4 sec
(RISK-2701) Risk Dependency Analysis in Complex Projects Presentation: 0.1 CEU Paolo Cavanna, Franco Caron, Filippo Fratoni, 62 min 1 sec
(TCM-2392) Reviving Entrepreneurial Thinking and Behavior in Capital Projects Presentation: 0.1 CEU Scott Whitbread, Nathaniel D. Greene, 55 min 8 sec
(TCM-2500) The True Power of Estimate and Schedule Bases Documents Presentation: 0.1 CEU Robert Mathias, Paul G. Williams, 58 min 13 sec
(TCM-2503) The Economic Effects of a Revenue Neutral Fee on Fossil Fuels Presentation: 0.1 CEU Desmond Orsinelli, PE CCP CEP, 61 min 33 sec
(TCM-2534) Mining and Mineral Processing Uniform Cost Coding Structure Presentation: 0.1 CEU Tas Hellis, 46 min 39 sec
(TCM-2535) Portfolio Scheduling – How to Achieve Success and What Does Success Look Like? Presentation: 0.1 CEU John C. Philbrick, PE CCP, Francisco A. Cruz Moreno, PE, 59 min 1 sec