Skip to main content

Improving Project Cost and delivery Through Progressive Steel Joist and Deck Design

About This Program

This course discusses actual project scenarios where early collaborative steel joist and deck design have reduced total-project costs. In an era when incomplete structural drawings are a growing concern for our industry, the course reveals many of the hidden costs and risks that can be avoided when specifying structural steel joist and deck building systems.

Session Takeaways

  • Understand the cost outcomes of incomplete drawings and the need for an efficient RFI process.
  • Know how and where to improve project cost/performance through early steel joist and deck design collaboration.
  • Know when to specify and integrate a “composite” roof and floor system to optimize project cost/performance.
  • Know how BIM can improve project cost and performance.

Symbol Key

Indicates item required for certificate
Indicates item has been completed
Indicates item locked until previous item complete

Learning Units

CSI: 1.0 LU
*May be submitted for domain specific learning units to CDT recertification, and/or general learning units for CCCA, CCS, and CCPR.
AIA: 1.0 LU

Relevant Practices

Contracting/Construction Management
Design/Engineering
Project Delivery
Specifying
Supply/Product Representation