With the many different air barrier systems to choose from, ensuring that the entire wall section works as a system is paramount to proper wall construction. Modern buildings utilize many building envelope materials and many backup construction types, such as masonry, CFMF & sheathing, concrete, and metal panel, each with its own detailing and concerns. The air barrier installation must be coordinated with the building envelope materials and the backup construction. The review for the constructability of air barriers starts at the building design phase and goes through the construction observation phase. This presentation will identify the many different substrate conditions and critical transitions on a complex building and will give you the tools to better understand the sequencing needed to complete the installation to prevent constructability issues and potential rework in the field.

Session Takeaways

  • Discuss the systems and how they will be integrated into the project-specific details with other building products.
  • Identify typical areas of concern with regard to installation constructability and coordination between all the trades and adjacent building components in the design through construction phases.
  • Create an action plan for transition detailing and materials.
  • Learn how to prevent constructability/compatibility issues before construction.

Symbol Key

Indicates item required for certificate
Indicates item has been completed
Indicates item locked until previous item complete

Learning Units

CSI: 1.0 LU
*May be submitted for domain specific learning units to CDT recertification, and/or general learning units for CCCA, CCS, and CCPR.
AIA: 1.0 LU/HSW*
*Approved for AIA credit.

Relevant Practices

General Project Delivery
Specifying/Information Management
Product Selection/Specification
Procurement
Construction Management/Construction
Quality Assurance/Quality Control