(BIM-1348) Validating a Quantity Takeoff Generated by a Building Information Model Presentation: 0.1 CEU Dr. Tamera L. McCuen, 51 min 22 sec
(CDR-1212) Forensic Analysis of Superstorm Sandy Damage Presentation: 0.1 CEU Mr. William M. Hart PE CFCC PSP, 56 min 9 sec
(CDR-1213) An Introduction to Dispute Boards and All Its Forms Presentation: 0.1 CEU Mr James Charles Perry, 63 min 26 sec
(CDR-1240) Trends in International Construction Arbitration Presentation: 0.1 CEU Peter V. Badala, 65 min 9 sec
(CDR-1246) Avoiding the Pitfalls in Implementing the Measured Mile Method Presentation: 0.1 CEU Dr. Tong Zhao, PE PSP, 53 min 44 sec
(CDR-1254) EOT Claims: Successful Navigation through a Legal and Technical Minefield Presentation: 0.1 CEU Dr Anamaria I Popescu PE PSP, Mr John C. Jerz, 56 min 53 sec
(CDR-1256) Challenges of the Measured Mile Concept for Productivity Loss Claims Presentation: 0.1 CEU Mr Philip D Barnard PE CCE, 41 min 42 sec
(CDR-1273) Forensic Schedule Analysis on Risk Adjusted Schedules Presentation: 0.1 CEU Mr John C Livengood CFCC PSP, Mr Patrick M Kelly PE PSP, 61 min 40 sec
(CDR-1278) Disruption Analysis by CPM Out-of-Sequence Methodology Presentation: 0.1 CEU Dr Fredric L. Plotnick PE, 63 min 28 sec
(CDR-1356) Windows Analysis versus Half-Step Analysis Progress Impact Quantification Presentation: 0.1 CEU Greta A. Martin, PE PSP, 38 min 30 sec
(CDR-1382) Schedule Activity Density Analysis Presentation: 0.1 CEU Mr Jeffery L. Ottesen PE CFCC PSP, Mr Kenji P Hoshino CFCC PSP , 59 min 39 sec
(CDR-1402) Mis-Using the Measured Mile Concept to Make a Claim Presentation: 0.1 CEU Mr Robert D. Kelly Jr CFCC PSP , 36 min 30 sec
(CDR-1404) Adapting Alternative Dispute Resolution to Meet the Demands of Modern Projects Presentation: 0.1 CEU Mr. Christopher M. Anzidei, Mr. Adam M. Tuckman, Mr Blake V. Peck PE, Mr Brian M. Perlberg, 62 min 28 sec
(CDR-1436) Generating Claims through Contract Provisions and Management Practices Presentation: 0.1 CEU Mark F Nagata PSP , Mr Frank DiCianni, 59 min 47 sec
(CDR-2013S1) (Presentation Only) Concurrent Delay - The Owner's Newest Defense Presentation: 0.1 CEU James G Zack Jr CFCC , 52 min 31 sec
(CDR-2013S2) (Presentation Only) Time Extension Requests - A Checklist Presentation: 0.1 CEU James G. Zack, Jr., 63 min 46 sec
(CSC-1206) Estimating Theme Parks and Attractions Presentation: 0.1 CEU Asif Parkar CCC CEP EVP PSP, 53 min 23 sec
(CSC-1352) Controlling Cost through the Estimating and Risk Assessment Process Presentation: 0.1 CEU Joseph W Wallwork PE CCE CFCC PSP, 60 min 54 sec
(CSC-1430) Developing a Project Control System for a Transmission Grid Presentation: 0.1 CEU Vidya C. Dixit CCE PSP, 42 min 4 sec
(DEV-1318) Pardon Me - Your Personality Is Showing! Presentation: 0.1 CEU Joseph A. Lukas PE CCP, 52 min 12 sec
(EST-1239) The Impact of Rework on Construction and Some Practical Remedies Presentation: 0.1 CEU Jason M. Dougherty, Nigel Hughes, James G Zack Jr CFCC, 59 min 56 sec
(EST-1247) The Cost Impact of LEED-NC v3.0 Minimum Energy Performance Prerequisite 2 on Warehouse Design Presentation: 0.1 CEU Leigh Shaw, Dr. Khalid Siddiqi, 25 min 29 sec
(EST-1310) Estimating Escalation Costs for Thermal Power Plants Presentation: 0.1 CEU Bruno N. Rodrigues, Clemence R. Dawed, Antoine de Chillaz, Bastien Durand, Sebastien Binet, 22 min 54 sec