(ADV-3694) (Presentation Only) COVID-19 the New "Normal" for Global Construction Presentation: 0.1 CEU John G. McConville, CCP, 34 min 24 sec
(ADV-3726) Accelerating Disaster Recovery with an Integrated Smart City Model Presentation: 0.1 CEU Yusa H. Battal, Robert Boys, Damon Armeni, Natalie Hutcheson, Naanzem Hoomkwap, Jodie Kim, Mark Blumkin, 43 min 11 sec
(BIM-3653) Application of BIM in Earned Value Management for Large-Scale Complex Construction Projects Presentation: 0.1 CEU Xuejiao Liu, Chunfu Xu, Liqiu Kang, 28 min 32 sec
(BIM-3675) Using 4D Modeling to Perform Critical Path Analysis for Delays Presentation: 0.1 CEU Christopher W. Carson, CEP DRMP PSP FAACE, Sadia Janjua, PSP, Wesley Beaumont, 66 min 32 sec
(BIM-3678) BIM+ Integrated Site Data Acquisition Model for Construction Projects Presentation: 0.1 CEU Ali Montaser, P.Eng. CCP EVP PSP, Dr. Osama El Sayed Moselhi, P.Eng., 63 min 16 sec
(BIM-3682) Control+ Integrated Data Analysis and Reporting for Construction Projects Presentation: 0.1 CEU Ali Montaser, P.Eng., Dr. Osama El Sayed Moselhi, P.Eng., 40 min 56 sec
(BIM-3692) BIM and Cost Estimation: What Will Change and What Will Remain the Same Presentation: 0.1 CEU Fernando Valderrama, 54 min 35 sec
(CDR-3613) Weather Impacts and Loss of Productivity Claims Presentation: 0.1 CEU Tong Zhao, PE PSP, J. Mark Dungan, 47 min 7 sec
(CDR-3621) Challenges in Selection of the Most Defendable Method Implementation Protocol (MIP) as Recommended by AACE RP 29R-03 in Case Study of Two Project Schedules Presentation: 0.1 CEU Saeid Khademagha, P.Eng., Abbas Saifi, 42 min 31 sec
(CDR-3622) Timing Your Time Extensions and General Conditions Costs Presentation: 0.1 CEU Brian J. Furniss, PE PSP CFCC, Matthew G. Nichols, PSP, 59 min 44 sec
(CDR-3650) Allocation Methods for Direct Costs on Large Projects Presentation: 0.1 CEU William C. Schwartzkopf, Peter Armstrong, 39 min 3 sec
(CDR-3684) Cost Assessment Model for Schedule Recovery due to COVID-19 Event in China Presentation: 0.1 CEU Lan Zhang, Ruifu Zhou, 15 min 42 sec
(CDR-3697) A Decision Tree Approach for the Analysis of Construction Delay Claims Presentation: 0.1 CEU Dr. Hendrik Prinsloo, 49 min 45 sec
(CDR-3711) There is No Such Thing As a Free Non-Work Day Presentation: 0.1 CEU Cory R. Milburn, CCP CFCC PSP, Khaled M. Aziza, EVP PSP, 59 min 34 sec
(CDR-3719) Concurrency's Role in Assessing Construction Delay Claims Presentation: 0.1 CEU Brenton Sadauskas, PSP, Russell H. Wodiska, EVP, 59 min 1 sec
(CDR-3732) "Concurrent Events" and Other Scheduling Issues in the News Presentation: 0.1 CEU Christopher J. Brasco, Esq., Matthew D. Baker, Esq., Dakus Gunn, 68 min 44 sec
(CDR-3743) The Top Ten Mistakes Made In Forensic Analysis Presentation: 0.1 CEU Glen R. Palmer, CFCC PSP FAACE, Christopher W. Carson, CEP DRMP PSP FAACE, 62 min 33 sec
(CSC-3609) Causes and Impacts of Delay in Construction Project in Saudi Arabia Presentation: 0.1 CEU Mossab Abbas Elkhidir, Sr. CCP, 50 min 29 sec
(CSC-3620) High-Confidence Methods for Assessing Complex Project Time and Cost Presentation: 0.1 CEU Abbas Saifi, Saeid Khademagha, P.Eng., 65 min 35 sec
(CSC-3683) A Cost Control Model for a Medical Facility in China Presentation: 0.1 CEU Lan Zhang, Hao Hu, Aiguo Huang, 24 min 37 sec
(CSC-3710) Exploring the Effectiveness of an Independent-Integrated Project Controls Group - A Case Study Presentation: 0.1 CEU Lipika Swarup, Dr. Erica Cochran Hameen, 22 min 37 sec
(CSC-3734) A Case Study in the Rapid Deployment of New Forecasting Algorithms on a Large Tollway Construction Program Presentation: 0.1 CEU D. Andy Keels, Richie Walker, PSP, 61 min 57 sec
(CSC-3768) Practical Approach on Resource and Cost Loading a Project Schedule Presentation: 0.1 CEU Gino Napuri, EVP, Mir M. Ahmad, PSP, 32 min 42 sec
(DEV-3686) (Panel Discussion) Career Stories in Planning and Scheduling Presentation: 0.1 CEU Avi Sharma, Abdelhady Ossama Hosny, Jermaine A. Allen, PSP, John A. Armstrong, PSP, Santosh Bhat, PSP, 70 min 10 sec
(DEV-3687) Expected Competencies of Graduate Quantity Surveyors Working in New Zealand Presentation: 0.1 CEU Kam Yuen Cheng, CCP, Meng Yan, 20 min 12 sec