(CDR-3790) Delay Claim Entitlement Under FIDIC Contracts Presentation: 0.1 CEU Shannon Foster, PSP, Dr. Tong Zhao, PE CCP CFCC PSP, 57 min 44 sec
(CDR-3828) Complex Project Forensic Delay Analysis: Applying Multiple, Overlapping TIAs to Schedule Updates Through the Project Duration Presentation: 0.1 CEU Becky Smith, 57 min 58 sec
(CDR-3829) Analyzing Delay When Owner-Provided Work Quantities Are Wrong Presentation: 0.1 CEU Tara L. Hannebaum, William C. Schwartzkopf, 41 min 4 sec
(CDR-3852) Validating Schedules to Conduct a Reliable Forensic Schedule Analysis Presentation: 0.1 CEU Jessica Lunte, Katherine Hull, Bassel Safa, 45 min 38 sec
(CDR-3868) Recommendations in Dealing with Disruptions and Loss of Productivity during Global Events (e.g. COVID-19 Pandemic) Presentation: 0.1 CEU Khaled M. Aziza, EVP PSP, Ahmed El Kharbotly, Dr. Hatem Ibrahim, PE, 65 min 5 sec
(CDR-3870) Progress is Best Measured One "Half-Step" At A Time Presentation: 0.1 CEU Christopher J. Brasco, Dakus Gunn, Glen B. Grant, CCP PSP, Matthew D. Baker, 60 min 1 sec
(CDR-3873) Identification of Concurrency Through Literal Theory or Functional Theory, Freedom in Selection, or Dictated by Project Considerations? Presentation: 0.1 CEU Saeid Khademagha, P.Eng. PSP, 58 min 8 sec
(CDR-3874) Termination for Convenience - What Is It? How Does It Work? What to Do? Presentation: 0.1 CEU James G. Zack, Jr. CFCC FAACE Hon. Life, 44 min 49 sec
(CDR-3877) Overtime and Loss of Productivity Claims Presentation: 0.1 CEU Dr. Hatem Ibrahim, PE, Dr. Tong Zhao, PE CCP CFCC PSP, 61 min 33 sec
(CDR-3895) Making Changes to the Schedule When Performing MIPs 3.3 and 3.4 Presentation: 0.1 CEU Mark F. Nagata, PSP, Michael P. Ryan, PE PSP, 67 min 34 sec
(CDR-3896) Strategies for Testifying Experts to Handle Attorney Challenges Presentation: 0.1 CEU Greg Holness, PE, Dr. Stephen P. Warhoe, PE CCP CFCC FAACE Hon. Life, Gary C. Chiumento, Esq., Christopher W. Carson, CEP DRMP PSP FAACE, 59 min 28 sec
(CDR-3921) Schedule Analysis without Schedules?! – Applying Earned Value Analysis in the Absence of Progress Updates Presentation: 0.1 CEU Rachel Domingo, PSP, Dr. Aaron Fackler, PSP, 50 min 55 sec
(CDR-3924) Project Documentation: Supporting Your Position Presentation: 0.1 CEU Christopher P. Caddell, PE CCP DRMP, Sydney G. Overman, CST, 58 min 58 sec
(CDR-3949) How to Discretely Identify Delay and Disruption Presentation: 0.1 CEU Anthony J. Gonzales, Bassel Safa, 68 min 53 sec
(CSC-3787) Schedule Delays: Why They Happen & How to Avoid Them Presentation: 0.1 CEU Vijaykumar A. Damle, 63 min 59 sec
(CSC-3791) Extra! Extra! Read All About It! The Schedule Narrative Tool Presentation: 0.1 CEU Joseph V. Caldarera, PSP, 60 min 32 sec
(CSC-3831) Advancing Project Management with Multi-Dimensional Project Controls and Digital Twin Presentation: 0.1 CEU Dr. Bahadir V. Barbarosoglu, CCP EVP PSP, Ben Milner, 60 min 34 sec
(CSC-3837) Advanced Work Packaging (AWP): An Introduction and Project Controls Guide for Implementation Presentation: 0.1 CEU Ferdinand R. Karbowski, Jr. PSP, 66 min 50 sec
(CSC-3867) Leverage Innovative Technologies and Standardized Coding System for Real-Time Project Cost Control Presentation: 0.1 CEU Jing Xu, 52 min 35 sec
(CSC-3869) Alternative KPIs in the Absence of Cost or Resource-Loading Presentation: 0.1 CEU Morvarid Majlessi-Kupai, Mohamed A. Elshazly, PSP, 53 min 51 sec
(DEV-3901) (Panel Discussion) Career Stories in Claims & Dispute Resolution Presentation: 0.1 CEU Avi Sharma, 61 min 22 sec
(DSAA-3798) Implementation of a Project Data Warehouse Presentation: 0.1 CEU Eric Vyskocil, 61 min 33 sec
(DSAA-3814) Data Collection and Visualization for an Improved Analysis of Historical Project Data Presentation: 0.1 CEU Helge Schlott, Luis A. Garcia Loera, CEP, 60 min 38 sec
(DSAA-3816) Data Model for Advanced Data Analytics Presentation: 0.1 CEU Subhash Tuladhar, 23 min 10 sec
(DSAA-3862) Machine Learning: Classification and Clustering Strategies for Work Breakdown Structures Presentation: 0.1 CEU Maura Lapoff, 58 min 46 sec