Skip to main content

AACE

Events
Courses
Product Bundles
Search
Sign Up
Sign In

Item Added to Cart

You just added

You have item(s) in your cart

  • Proceed to Checkout
  1. Product Bundles
  2. Conference Series #07: Deci...

Conference Series #07: Decision and Risk Management, Vol.1, (2012-2017)

Conference Series #07: Decision and Risk Management, Vol.1, (2012-2017)
Price: $985 (Member)/$1970 (Non-Member)
50% less than if purchased individually
CEUs Awarded: 7.9

This bundle contains 79 annual conference presentations on various decision and risk management related topics. Each presentation is approximately one hour long. For a detailed list click here.

$985.00 - $1,970.00
Member
$985.00
Non-Member
$1,970.00
Purchase
« First ‹ Prev 1 2 3 4 Next › Last »
Items Included in the Purchase of this Product Bundle

(RISK-1504) Critical Decision Making for Project Planners and Controllers

Presentation: 0.1 CEU Mr. Frank Parth PMP, 54 min 28 sec

(RISK-1522) Construction Risk Estimating and Management

Presentation: 0.1 CEU Daniel Holzman CCP, 62 min 31 sec

(RISK-1523) Estimating Risks

Presentation: 0.1 CEU Dr. Ovidiu Cretu PE, Vlad Cretu, 62 min 1 sec

(RISK-1544) Risks Associated with Concession-Based Contracts in Lagos State, Nigeria

Presentation: 0.1 CEU Godwin Jagboro, Grace Kehinde Ojo, Akintayo Opawole, Gabriel Akindoyin Sani, 65 min 31 sec

(RISK-1574) Managing Risks in Supplier Design Integration

Presentation: 0.1 CEU Richard C Plumery EVP, 56 min 4 sec
Presentation Icon

(RISK-1584) Risk Analysis at the Edge of Chaos

Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, 58 min 1 sec

(RISK-1587) Bracket Budgeting

Presentation: 0.1 CEU Michael W. Curran DRMP, 44 min 4 sec

(RISK-1594) The Flaw of Averages and the Use of Statistical Tools in Project Environment

Presentation: 0.1 CEU Thiago Henriqe Rezende Medeiros, Rafael Gonalves Monteiro, 27 min 48 sec

(RISK-1626) Uncertainty Assessment of Business Plans Using Monte Carlo Simulations

Presentation: 0.1 CEU Antoine de Chillaz, Bruno N. Rodrigues, 29 min 27 sec

(RISK-1639) Building an Enterprise Risk Management Program

Presentation: 0.1 CEU David Huter, Tooran Khosh PE, Nicholas Johnson PE , Michael Thomas Watry, 58 min 55 sec
Presentation Icon

(RISK-1662) Using Stochastic Optimization to Improve Risk Mitigation

Presentation: 0.1 CEU Eric Druker, Graham Gilmer, Dr. David T. Hulett , 43 min 26 sec

(RISK-1684) Schedule Review of the Risk Model for Pipeline Projects

Presentation: 0.1 CEU Gregory J. Whiteside CCP, 45 min 39 sec

(RISK-1698) Integrating with Project Schedule Risk Improves Analysis of Cost Risk

Presentation: 0.1 CEU Dr. David T. Hulett , Eric Druker, 65 min 16 sec
Presentation Icon

(RISK-1721) Variability in Accuracy Ranges: A Case Study in the Canadian Hydropower Industry

Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, Raminder S. Bali, P.Eng., John M. Boots, P.Eng., Chantale Germain, P.Eng., Michel Guevremont, P.Eng. PSP, Kelman Kai-man Ng, P.Eng., 61 min 43 sec

(RISK-1763) Planning and Estimating Risky Projects: Oil and Gas Exploration

Presentation: 0.1 CEU Colin H. Cropley, Matthew D. Dodds, Grant Christie, 58 min 58 sec

(RISK-1764) AACE International Recommended Practice 67R-11: Contract Risk Allocation - As Applied in Engineering, Procurement, and Construction

Presentation: 0.1 CEU James E. Arrow FRICS DRMP, 57 min 52 sec

(RISK-1822) Delay Principles Based on Completion Risk

Presentation: 0.1 CEU Dr. Gui Ponce de Leon, PE, Dr. Vivek Puri , 48 min 11 sec

(RISK-1870) Owner's Risk in a Public-Private Partnership Project

Presentation: 0.1 CEU Phillip P Collin PE, David A Norfleet CCP CFCC DRMP , 60 min 12 sec

(RISK-1939) Risk Monitoring and Control in Construction Projects

Presentation: 0.1 CEU Ahmad Salah , Dr. Osama El Sayed Moselhi P Eng , 52 min 38 sec

(RISK-1955) Risk Management Capability Assessment

Presentation: 0.1 CEU Louis Fussell , 38 min 4 sec

(RISK-1964) If at First You Don't Succeed, Then Try Risk Workshops

Presentation: 0.1 CEU Tom Wagner, 54 min 55 sec

(RISK-1987) Joint Project Time and Cost Risk Analysis

Presentation: 0.1 CEU Bahaa Hussein, Dr. Osama El Sayed Moselhi P Eng , 53 min 31 sec
Presentation Icon

(RISK-1993) What To Do with Unknowns in Schedule Risk Analysis?

Presentation: 0.1 CEU Dr. David T. Hulett , 65 min 21 sec

(RISK-2016S2) (Presentation Only) Estimate Accuracy: Dealing with Reality

Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, 46 min 4 sec

(RISK-2054) Risk-Based Estimate and Risk Treatment Planning

Presentation: 0.1 CEU Dr. Ovidiu Cretu PE, Vlad Cretu, 62 min 0 sec
« First ‹ Prev 1 2 3 4 Next › Last »
  • Events
  • Courses
  • Search
  • Support
  • Sign Up
  • Sign In
  • Privacy Policy | Cookies Policy