Skip to main content

AACE

Events
Courses
Product Bundles
Search
Sign Up
Sign In

Item Added to Cart

You just added

You have item(s) in your cart

  • Proceed to Checkout
  1. Product Bundles
  2. Conference Series #07: Deci...

Conference Series #07: Decision and Risk Management, Vol.1, (2012-2017)

Conference Series #07: Decision and Risk Management, Vol.1, (2012-2017)
Price: $985 (Member)/$1970 (Non-Member)
50% less than if purchased individually
CEUs Awarded: 7.9

This bundle contains 79 annual conference presentations on various decision and risk management related topics. Each presentation is approximately one hour long. For a detailed list click here.

$985.00 - $1,970.00
Member
$985.00
Non-Member
$1,970.00
Purchase
« First ‹ Prev 1 2 3 4 Next › Last »
Items Included in the Purchase of this Product Bundle

(RISK-2130) An Introduction to 77R‐15: Quality Control/Quality Assurance for Risk Management

Presentation: 0.1 CEU David C. Brady, P.Eng. DRMP, Dr. Alexia A. Nalewaik, CCP FAACE, 56 min 5 sec
Presentation Icon

(RISK-2142) The Monte Carlo Method for Modeling & Mitigating Systemic Risk

Presentation: 0.1 CEU Dr. David T. Hulett, FAACE, Waylon T. Whitehead, 64 min 55 sec

(RISK-2196) Removing the Early-Dates Bias in CPM Risk Analysis

Presentation: 0.1 CEU Dr. Gui Ponce de Leon, PE, Dr. Vivek Puri, 53 min 4 sec

(RISK-2238) Risk Mitigation in EPC Projects of Fossil-Fuel Power Plants

Presentation: 0.1 CEU Paul Alexander Villanueva, PE CCP, Jeancarlo Duran Maica, CCP EVP, 58 min 24 sec

(RISK-2249) Practical Integration of Risk Management and Quality Management Processes

Presentation: 0.1 CEU David A. Norfleet, CCP CFCC DRMP, 52 min 46 sec

(RISK-2342) (Panel Discussion) An Interviewing and Risk Analysis Process for a Risk Workshop

Presentation: 0.2 CEU Dr. David T. Hulett FAACE, Eric Ho, Christopher W. Carson, CEP DRMP PSP FAACE, David C. Brady, P.Eng. DRMP, 123 min 10 sec

(RISK-2394) An Introduction to Analysis for Small Data Populations

Presentation: 0.2 CEU James D. Whiteside, II PE FAACE, Gregory J. Whiteside, PE CCP, 128 min 12 sec

(RISK-2404) Holistic Project Assessment (HPA)

Presentation: 0.1 CEU Ken Cressman, CCP EVP, 49 min 49 sec

(RISK-2406) Practical Risk Management for Airport Projects Case Study

Presentation: 0.1 CEU Hossam A. Eid Mohammed, 56 min 24 sec

(RISK-2441) Integrated Cost-Schedule Risk Analysis Using Monte Carlo Simulation

Presentation: 0.1 CEU Dr. David T. Hulett FAACE, 63 min 26 sec

(RISK-2442) Numerical Bias of Risk Teams vs. Project Actual Bid Results

Presentation: 0.1 CEU David A. Hamilton, PE CCP, 59 min 36 sec

(RISK-2445) Risk and Uncertainty Practices in GAO’s Best Practice Guides

Presentation: 0.1 CEU Karen Richey, Jason T. Lee, 57 min 10 sec

(RISK-2459) (Panel Discussion) DRM Special Track on Quantification Methods

Presentation: 0.2 CEU James E. Arrow, DRMP, Colin H. Cropley, Dr. David T. Hulett, FAACE, John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, 121 min 12 sec

(RISK-2470) From Activity-Based Ranging to Risk Driver Approach

Presentation: 0.1 CEU Craig Veteto, 57 min 58 sec

(RISK-2473) Lessons Learned in Completing a Tailored Project Risk Management Assessment Tool

Presentation: 0.1 CEU Bryan A Skokan PE CCP, Connie (Wei) Liu, Rodney Lehman, Jake Lefman, Dan Melamed CCP EVP , 51 min 46 sec

(RISK-2488) A Rationale for Lean Models for Quantitative Schedule Risk Analyses

Presentation: 0.1 CEU Luis O. Figueroa, 55 min 20 sec

(RISK-2505) Fully Integrated Cost Schedule Model – A Stochastic Alternative

Presentation: 0.1 CEU Liwen Ren, Gustavo Vinueza C., 41 min 53 sec

(RISK-2510) Modelling Realistic Outcomes Using Integrated Cost and Schedule Risk Analysis

Presentation: 0.1 CEU Colin H. Cropley, 47 min 44 sec

(RISK-2511) Role of Project Novelty, Execution and Bias in Risk Quantification

Presentation: 0.1 CEU Dr. Yuri Raydugin, P.Eng., 64 min 6 sec

(RISK-2515) Realistic and Practical Project Risk Quantification (without CPM)

Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, 57 min 16 sec
Presentation Icon

(RISK-2516) Variability in Accuracy Ranges: A Case Study in the Canadian Power Transmission Industry

Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, Andrea Almeida, P.Eng., Raminder S. Bali, P.Eng., John M. Boots, P.Eng., Kevin Burnham, Victor Hsieh, Qaiser Iqbal, P.Eng., Donald Konan, P.Eng., Guillaume Lafortune, P.Eng., Joe Ly, Clement Wu, P.Eng., 56 min 53 sec

(RISK-2523) Application of Chaos in Megaproject Risk Analysis Models

Presentation: 0.1 CEU Jin Feng, Xiang Wenwu, Zhang Bochen, 28 min 22 sec

(RISK-2555) Contingency Cage Match: Simultaneous Contingency Assessment Methods, A Case Study

Presentation: 0.1 CEU Matthew Schoenhardt, P.Eng., Vachel Pardais, 56 min 29 sec

(RISK-2570) An Engineering Approach to Schedule Risk Assessment

Presentation: 0.1 CEU Angela Tuffley, Adrian Pitman, Dr. Elizabeth Clark, 59 min 9 sec

(RISK-2592) Integrated Cost/Schedule Risk Analysis for Pre-Concept Alternatives Analysis/Technology Selection

Presentation: 0.1 CEU Samuel Steiman, PE, Molly Donovan, 67 min 14 sec
« First ‹ Prev 1 2 3 4 Next › Last »
  • Events
  • Courses
  • Search
  • Support
  • Sign Up
  • Sign In
  • Privacy Policy | Cookies Policy