Have an attendance code? Sign In to enter it.
This live web event has ended. Thank you for attending.
Description
SFU Stadium
SFU Stadium strives to advance the use of mass timber in stadia type construction with the crowning piece being a 10,000 sq. ft. CLT canopy that cantilevers 16 metres. The talk will cover the process of the award-winning SFU Stadium project from concept to construction. Chris will take a deep dive in to the key technical challenges the team had to overcome to achieve the project team’s vision of a seamless floating plane of CLT. Key topics Chris will cover include the structural detailing, procurement and dynamic performance of the as-built construction.
Presented by: Chris Mills, Fast + Epp
- Course will award 1.0 hours of continuing education for the live session only.
- Each series registration is per person.
- This will be available as a recording, with no PDH attached.
