Skip to main content

AACE

Events
Courses
Product Bundles
Search
Sign Up
Sign In

Item Added to Cart

You just added

You have item(s) in your cart

  • Proceed to Checkout
  1. Product Bundles
  2. Conference Series #03: Cost...

Conference Series #03: Cost Estimating, Vol.1 (2012-2017)

Conference Series #03: Cost Estimating, Vol.1, (2012-2017)
Price: $560 (Member)/$1120 (Non-Member) 50% less than if purchased individually
CEUs Awarded: 4.7

This bundle contains 46 annual conference presentations on various cost estimating related topics. Each presentation is approximately one hour long. For a detailed list click here.

$560.00 - $1,120.00
Member
$560.00
Non-Member
$1,120.00
Purchase
1 2 Next › Last »
Items Included in the Purchase of this Product Bundle

(EST-809) Using Monte Carlo Analysis to Estimate Remediation Costs for Contaminated Oilfield Sites

Presentation: 0.1 CEU Randy D. Horsak, 54 min 9 sec

(EST-821) Estimating the Green Premium: An Oklahoma City Case Study

Presentation: 0.1 CEU Rachel Mosier, Dr. Douglas D Gransberg, PE, CCP , 57 min 47 sec

(EST-901) Project Scope of Work and Cost Estimating

Presentation: 0.1 CEU Kul B Uppal PE CEP DRMP, 41 min 53 sec
Presentation Icon

(EST-912) Pricing Projects in a Continuing Hyper Competitive Market

Presentation: 0.1 CEU Michael D Dell'Isola PE FRICS, 58 min 57 sec

(EST-1013) An Effective and Ethical Approach to the GC Bid Process

Presentation: 0.1 CEU Christopher W. Carson, CEP DRMP PSP FAACE, 60 min 56 sec

(EST-1057) Presenting an Estimate to Your client

Presentation: 0.1 CEU David Colangelo CCC, 62 min 4 sec

(EST-1104) Pricing Contractor Delay Costs

Presentation: 0.1 CEU James G Zack Jr CFCC, Peter V. Badala, 50 min 32 sec

(EST-1239) The Impact of Rework on Construction and Some Practical Remedies

Presentation: 0.1 CEU Jason M. Dougherty, Nigel Hughes, James G Zack Jr CFCC, 59 min 56 sec

(EST-1247) The Cost Impact of LEED-NC v3.0 Minimum Energy Performance Prerequisite 2 on Warehouse Design

Presentation: 0.1 CEU Leigh Shaw, Dr. Khalid Siddiqi, 25 min 29 sec

(EST-1310) Estimating Escalation Costs for Thermal Power Plants

Presentation: 0.1 CEU Bruno N. Rodrigues, Clemence R. Dawed, Antoine de Chillaz, Bastien Durand, Sebastien Binet, 22 min 54 sec

(EST-1394) (Presentation Only) The AACE Recommended Practice on the Principles of Estimate Accuracy

Presentation: 0.1 CEU Larry R Dysert CCC CEP, 61 min 15 sec

(EST-1411) Construction Indirect Estimate Challenges and Opportunities

Presentation: 0.1 CEU Rakesh K. Gupta, 36 min 40 sec

(EST-1559) Software Project Cost Estimation Based on Quick Function Point Method

Presentation: 0.1 CEU Dr. Cao Ji, Cao Guangyi, Wen Li, 46 min 36 sec

(EST-1579) A DIY (Do It Yourself) Unit Cost Database

Presentation: 0.1 CEU William E. Kraus P.E. CCP, 46 min 28 sec

(EST-1619) Benchmarking Mining and Minerals Processing Projects

Presentation: 0.1 CEU Frederick P. Biery, Maggie Stewart, 60 min 19 sec

(EST-1648) Cost Estimating for Offshore Oil & Gas Facility Decommissioning

Presentation: 0.1 CEU Dr. Robert C. Byrd PE, Donald J. Miller, Steven M. Wiese, 56 min 20 sec

(EST-1681) (Panel Discussion) Construction Cost Estimating: Challenges and Opportunities

Presentation: 0.1 CEU Michael R. Morrison, CCP, Douglas W. Leo, CCP CEP FAACE Hon. Life, Larry R. Dysert, CCP CEP DRMP FAACE Hon. Life, Carlton W. Karlik, CEP, 71 min 6 sec

(EST-1812) Ten Cost Estimating Observations

Presentation: 0.1 CEU Joe Kabeiseman, 43 min 12 sec

(EST-1838) The Evolution of Public Works Contracting in Brazil

Presentation: 0.1 CEU Tatiana Thome de Oliveira, Paulo Roberto Kozlowski Tannenbaum Filho, Sergio Rodovalho Pereira, 49 min 51 sec

(EST-1841) The Impact of Cost Estimation Methodologies on Cost Overruns

Presentation: 0.1 CEU Morten Welde, James Odeck, Geir Saxebol, 59 min 45 sec

(EST-1852) Identifying Key Cost Drivers of Well Abandonment Utilizing Regression Analysis

Presentation: 0.1 CEU John R Parson CCT CCP, Adam Pieknik, 48 min 49 sec
Presentation Icon

(EST-1958) Planning the Future: Methodologies for Estimating U.S. Nuclear Stockpile Cost

Presentation: 0.1 CEU Frank Douglas Lewis, Cash Fitzpatrick, Matt Proveaux, Cole Lillard, William P Todd, 60 min 26 sec

(EST-1916) Regression-Based Estimation of Material Quantities Using Case-Based Reasoning

Presentation: 0.1 CEU Dr Borja Garcia de Soto PE, Bryan T Adey, 40 min 20 sec

(EST-1994) Introducing an Alternative Cost Model for Detailed Construction Estimating

Presentation: 0.1 CEU Dr. Ming Lu, Dr. Fei Dai, 57 min 0 sec

(EST-2008) A Case for a Unified Work Breakdown Structure (WBS)

Presentation: 0.1 CEU James Oswell CCP, Max M Shoura PE PSP, 59 min 21 sec
1 2 Next › Last »
  • Events
  • Courses
  • Search
  • Support
  • Sign Up
  • Sign In
  • Privacy Policy | Cookies Policy