Skip to main content

AACE

Events
Courses
Product Bundles
Search
Sign Up
Sign In

Item Added to Cart

You just added

You have item(s) in your cart

  • Proceed to Checkout
  1. Product Bundles
  2. 2019 Annual Conference Coll...

2019 Annual Conference Collection

2019 Annual Conference Collection
Price: $500 (Member)/$750 (Non-Member)

$500.00 - $750.00
Member
$500.00
Non-Member
$750.00
Purchase
1 2 3 4 Next › Last »
Items Included in the Purchase of this Product Bundle

(BIM-3072) The Constructible Process – Moving Beyond BIM to Build with Confidence

Presentation: 0.1 CEU Jon Fingland, Chad Thelin, 58 min 30 sec

(CDR-3110) Concurrency and Pacing - Does Intent Matter?

Presentation: 0.1 CEU Josh Chittick, John C. Livengood, Esq. CCP CFCC PSP FAACE, 62 min 8 sec

(CDR-3145) Perfecting the Fixed Perspective Windows Delay Analysis

Presentation: 0.1 CEU John Jackson, 42 min 43 sec

(CDR-3147) A New Role for Project Control Professionals on Dispute Boards

Presentation: 0.1 CEU James G. Zack, Jr. CFCC FAACE Hon. Life, 68 min 26 sec

(CDR-3162) Identifying the As‐Built Critical Path Using Recommended Practice 29R-03

Presentation: 0.1 CEU Andrew Avalon, PE PSP, Christopher W. Carson, CEP DRMP PSP FAACE, John J. Ciccarelli, PE CCP PSP FAACE, Kenji P. Hoshino, CFCC PSP, John C. Livengood, Esq. CCP CFCC PSP FAACE, Mark C. Sanders, PE CCP CFCC PSP, 66 min 23 sec

(CDR-3167) Home Office Overhead - Which Formula Should You Use?

Presentation: 0.1 CEU Mark F. Nagata, PSP, 59 min 10 sec

(CDR-3173) Defending Against Loss of Productivity Claims

Presentation: 0.1 CEU Dr. Tong Zhao, PE PSP, J. Mark Dungan, Xuyang Liu, 61 min 0 sec

(CDR-3178) Overhead Costs in Delay and Productivity Claims

Presentation: 0.1 CEU Christi Fu, PE, 55 min 11 sec

(CDR-3193) How to Best Prepare for and Navigate a Subcontractor Default Insurance (SDI) Claim

Presentation: 0.1 CEU Michael Oliveri, PSP, Joseph W. Wallwork, PE CCP CFCC PSP FAACE, 59 min 52 sec

(CDR-3214) Understanding and Applying the Elements of Constructive Acceleration

Presentation: 0.1 CEU Cory R. Milburn, CFCC PSP, Brian J. Furniss, PE CFCC PSP, Matthew Nichols, PSP, 50 min 0 sec
Presentation Icon

(CDR-3228) Hot Tubbing Expert Witnesses – Does It Work?

Presentation: 0.1 CEU James G. Zack, Jr. CFCC FAACE Hon. Life, 58 min 8 sec

(CDR-3250) Practical and Legal Challenges to the Implementation of the Time Impact Analysis Method

Presentation: 0.1 CEU Dr. Waleed M. El Nemr, Hossam Eid Mohamed, EVP, 61 min 5 sec

(OWN-3236) Optimizing Your Management Reserve

Presentation: 0.1 CEU J. Gustavo Vinueza C., 52 min 2 sec

(CDR-3254) Claims Avoidance in Infrastructure Megaprojects: A Process Framework for Design-Build Contractors

Presentation: 0.1 CEU Rahul S. Mulik, CCP, 54 min 19 sec
Presentation Icon

(CDR-3260) Damages Without a Cause: Liquidated Damages Are a Penalty When Owners Recover Damages for Their Own Delay

Presentation: 0.1 CEU Christopher J. Brasco, Kathleen Olden Barnes, James G. Zack, Jr. CFCC FAACE Hon. Life, Kenji P. Hoshino, CFCC PSP, Matthew D. Baker, 66 min 15 sec

(CSC-3107) The Power of Projections: Innovative Schedule Forecasting Techniques

Presentation: 0.1 CEU Kenneth Carrico, Eric Dembert, PE, Michael Hollowell, Jeff Johannsen, Jesse Lund, CCP PSP, 59 min 58 sec

(CSC-3132) The Clear Flow Matrix: An Effective Production Control Technique Using Crew Level Planning

Presentation: 0.1 CEU Augusto Tiezzi, David Lott, PE, Wayne Lott, Dr. John D. Borcherding, Dr. William J. O'Brien, 58 min 9 sec

(CSC-3199) (Presentation Only) MS100 Modular Reporting Framework

Presentation: 0.1 CEU Aditya Arya, PSP, 63 min 42 sec

(DEV-3045) Problem Analysis using Statistical Safeguards

Presentation: 0.1 CEU Gregory J. Whiteside, PE CCP, James D. Whiteside, II, PE, FAACE, 45 min 30 sec

(DEV-3224) 14 Key Areas to Improving Your Cost and Schedule Team's Performance

Presentation: 0.1 CEU Stephen M. Beck, CCP, 55 min 23 sec
Presentation Icon

(EST-3184) Estimate Validation and Bias Assessment: Ratio-to-Driver Method

Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, 54 min 4 sec

(EST-3201) Predictive Analytics Can Improve Cost Estimating for Smart City Projects

Presentation: 0.1 CEU Anthony A. DeMarco, Richard Mabe, Grady Noll, 61 min 17 sec

(EST-3252) Cost Estimating in Hyperinflation Economies

Presentation: 0.1 CEU Francis Lira Vargas, 47 min 53 sec

(EST-3302) (Presentation Only) Overview of New Estimating Recommended Practices

Presentation: 0.1 CEU Dave Kyle, CCP CEP, 20 min 18 sec

(EVM-3155) Use of Earned Value Management as a Communication Tool With the Project Team and the Client

Presentation: 0.1 CEU Edward M. McNamee, Charles W. Immonen, 62 min 38 sec
1 2 3 4 Next › Last »
  • Events
  • Courses
  • Search
  • Support
  • Sign Up
  • Sign In
  • Privacy Policy | Cookies Policy