(PS-3217) Mastering Out-of-Sequence Progress – Part 3 Presentation: 0.1 CEU Ronald M. Winter, PSP FAACE, 56 min 23 sec
(PS-3243) Which Schedule Quality Assessment Metrics to Use? …and When? Presentation: 0.1 CEU Shoshanna Fraizinger, CCP, 58 min 25 sec
(PS-3244) Understanding Risk in Design-Build Schedules Presentation: 0.1 CEU Jessica Colbert, PSP, Kimberly D. Forbes, PSP, 56 min 7 sec
(PS-3255) The Benefits of the Linear Scheduling Method for Reviewing Non-Linear Projects Presentation: 0.1 CEU Stanko Pavlovic, P.Eng. PSP, 39 min 43 sec
(PS-3283) The Habits of Highly Effective Scheduling Presentation: 0.1 CEU Sylvia M. Donado, 46 min 32 sec
(PS-3293) Lessons Learned on Integrating a Linear Schedule with the CPM Schedule Presentation: 0.1 CEU Kristy Kastner, PSP, 45 min 58 sec
(PM-3062) Pre-Qualifying Contractors for Today's Project Delivery Needs Presentation: 0.1 CEU H. Lance Stephenson, CCP FAACE, 58 min 0 sec
(PM-3085) Portfolio Management: Case Study of a Brazilian Mining Company Presentation: 0.1 CEU Ricardo Gonçalves Alves, 63 min 11 sec
(PM-3105) Program Management Lessons Learned: Alaskan Way Viaduct Replacement Program Presentation: 0.1 CEU David Sowers, PE, Harry W. Jarnagan, PE CCP FAACE Hon. Life, Brian C. Smith, CCP, 60 min 59 sec
(PM-3124) Disruption Quantification in Small and Medium EPC Projects: A System Dynamics Model Presentation: 0.1 CEU Michael Mac Guinness, 32 min 45 sec
(PM-3134) Aerial Data Collection Accuracy and Insights to Infrastructure Decisions Presentation: 0.1 CEU Blaine Horner, Ryan Mextorf, Kyle Schroeder, Shanna Hawley, Timothy Bail, Travis Featherby, Vinay Nair, PE, 59 min 18 sec
(PM-3151) Optimized Cash-flow: Opportunities for Finance Solutions for Contractors and Owners Presentation: 0.1 CEU Dr. Ashraf Elazouni, P.Eng., 57 min 8 sec
(PM-3259) Improving Project Success by Introducing Safety Measures Early in the Project Life Cycle Presentation: 0.1 CEU Chantale Germain, P.Eng., Dr. Nathalie Drouin, 43 min 32 sec
(SK-3036) (Presentation Only) Overview of Construction Claims and Disputes Presentation: 0.3 CEU James G. Zack, Jr. CFCC FAACE Hon. Life, 169 min 29 sec
(RISK-3037) Combining Parametric and CPM-Based Integrated Cost-Schedule Risk Analysis Presentation: 0.1 CEU Colin H. Cropley, 64 min 42 sec
(RISK-3078) Cost and Schedule Risks Interact in Megaprojects Presentation: 0.1 CEU Dr. David T. Hulett, FAACE, Waylon T. Whitehead, 70 min 46 sec
(RISK-3111) Identifying the Most Probable Cost – Schedule Values from a Joint Confidence Level (JCL) Risk Analysis Presentation: 0.1 CEU Samuel Steiman, PE, Dr. David T. Hulett, FAACE, 69 min 36 sec
(RISK-3175) Actions for Improving Risk Management Culture Presentation: 0.1 CEU Aaron P. Ingebritson, PE, 38 min 12 sec
(RISK-3208) Risk Allocation to Assess Public Contract: Particular Case - Brazil Presentation: 0.1 CEU Helber Cunha Macedo, CCP, Carlos Eduardo M. F. Braga, Cesar Teodoro Ferreira, Fabrizio Cesar R. Fronseca, 38 min 13 sec
(RISK-3294) Some Key Points of Contingency Drawdown Curves Presentation: 0.1 CEU Kimberly Kozak, PE, David A. Norfleet, CCP CFCC DRMP, 73 min 25 sec
(RISK-3313) (Panel Discussion) The Future of Decision and Risk Management in the Post-Digital Era Presentation: 0.1 CEU Dr. Manjula Dissanayake, CCP, John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, Christopher P. Caddell, PE CCP DRMP, James E. Arrow, DRMP, Laurie S. Bowman CCP DRMP EVP PSP, Dev Amratia, Niran Shrestha, 62 min 6 sec
(TCM-3063) Strategic Portfolio Management: Supply Chain Methodologies Presentation: 0.1 CEU H. Lance Stephenson, CCP FAACE, Bryan Payne, Esq. PE CCP CFCC, 60 min 14 sec