(EST-3391) Risk Analysis Approach to Contingency From the Perspective of an Owner Estimator Presentation: 0.1 CEU Christopher L. Kinney, 58 min 46 sec
(EST-3403) (Presentation Only) Function Points: One Size Fits All Presentation: 0.1 CEU Daniel B. French, 43 min 14 sec
(EST-3404) (Presentation Only) From Point A to Point Estimate: How Requirements Become Function Points Presentation: 0.1 CEU Daniel B. French, Carol Dekkers, 54 min 44 sec
(EST-3412) (Presentation Only) Using Cost Enginering to Quantify and Identify Project Risks Presentation: 0.1 CEU Anthony M. Bazzini, 27 min 28 sec
(EST-3419) Estimating As It Pertains to Risk Management Presentation: 0.1 CEU Shoshanna Fraizinger, CCP, 77 min 37 sec
(EST-3423) Early Conceptual Estimating Methodologies Presentation: 0.1 CEU Larry R. Dysert, CCP CEP DRMP FAACE Hon. Life, Bruce G. Elliott, CCP FAACE, 64 min 33 sec
(EST-3424) Supporting Estimates with Effective Scope of Work Definition Presentation: 0.1 CEU Larry R. Dysert, CCP CEP DRMP FAACE Hon. Life, Todd W. Pickett, CCP FAACE, 53 min 14 sec
(EST-3454) Base Estimate, Estimate Accuracy, and Contingency Presentation: 0.1 CEU Kelly Newman, PE CEP, 37 min 5 sec
(EST-3480) (Presentation Only) Cost Estimate Classification Overview Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, 46 min 22 sec
(EST-3490) Cost Savings Possible from Converting California Offshore Platform Jackets to Artificial Reefs Presentation: 0.1 CEU John B. Smith, Dr. Robert C. Byrd PE, 26 min 32 sec
(EST-3542) A Discussion of the Cost Estimate Classification System: As applied in the Engineering, Procurement, Construction and Operations for the Environmental Remediation Industries Presentation: 0.1 CEU Dan Melamed, CCP EVP, Bryan A. Skokan, PE CCP, Gregory Mah-Hing, PE, Rodney Lehman, Jake Lefman, 44 min 40 sec
(EST-3559) Overview - Presenting an Estimate to the Client Presentation: 0.1 CEU David Colangelo, CCP, 47 min 39 sec
(EST-3563) (Presentation Only) Required Skills, Knowledge, Roles, and Responsibilities of a Project Estimator Presentation: 0.1 CEU Peter R. Bredehoeft, Jr. CEP FAACE, Jeffery J. Borowicz, CCP CEP PSP FAACE, 39 min 53 sec
(EVM-3456) "You Can't Get There From Here" - Real World Application of RP 80R-13: Estimate at Completion (EAC) Presentation: 0.1 CEU James E. Krebs, PE CCP FAACE, Brennan P. Cagney, CCP, 68 min 26 sec
(EVM-3508) Analysis of the Earned Schedule Forecasting Accuracy Presentation: 0.1 CEU Keight Charles Navarro Hurtado, PSP, 34 min 39 sec
(EVM-3544) Earned Schedule as a tool to Forecast Indirect Costs Presentation: 0.1 CEU Mostafa AbdelRazik, EVP PSP, 32 min 20 sec
(INT-3343) Claim Reducing Orientated Model in China Presentation: 0.1 CEU Lan Zhang, Hao Hu, Shenjing Zhang, 24 min 53 sec
(INT-3381) Dealing with Requests for EOT: The Peru Public Contracts Case Presentation: 0.1 CEU Guido J. Reyes, 40 min 45 sec
(INT-3435) Successful Holistic Approach for Cost Optimization in a Mega Project Presentation: 0.1 CEU Sahaiza Saat, Jesmin Jamel, 19 min 37 sec
(IT-3394) Use of Drones and Emerging Technology in Megaproject Supply Chain Presentation: 0.1 CEU Dr. F. Fred Rahbar, Musaab Al-Rushood, Dr. Fikri T. Dweiri, 43 min 27 sec
(OWN-3417) A Model for Project Governance for Major Construction Projects – Owner’s Perspective Presentation: 0.1 CEU Tariq Hussain, 38 min 52 sec
(OWN-3478) Owner Validation of Contractors’ Cost Forecasts Presentation: 0.1 CEU Robert C. Mathias, Paul G. Williams, Christopher F. Michalak, 50 min 20 sec
(OWN-3494) (Presentation Only) Owner Project Management Challenges that Affect Cost and Schedule Outcomes Presentation: 0.1 CEU Stephen L. Cabano, 50 min 52 sec
(OWN-3495) Deploying An Assurance Framework to Identify and Repair Distressed Projects Presentation: 0.1 CEU Joshua P. Rowan, CCP, 56 min 8 sec
(OWN-3497) Managing Scope Creep in the Public Sector Presentation: 0.1 CEU Rashmi Vailaya, Moraima Dones, 37 min 54 sec