(ADV-882) Acceptance of a Formalized Cost Engineering Implementation Presentation: 0.1 CEU Wayne A. Crabtree, James Wolf , Timothy John Havranek , 55 min 20 sec
(BIM-837) Building Information Modeling - The Cost Estimator's Role Presentation: 0.1 CEU Edward Keane CCC, 53 min 29 sec
(BIM-846) Application of BIM and GIS in Class 1-5 Cost Estimates Presentation: 0.1 CEU Apostolos Chatzisymeon PE, Nick Papadopoulos, George Chatzisymeon, 53 min 40 sec
(BIM-995) 4D Scheduling Using Delmia® and Microsoft Project® on Hydroelectric Construction Projects Presentation: 0.1 CEU Michel Guevremont, P.Eng. PSP, Chantale Germain, P.Eng., 43 min 3 sec
(BIM-1107) Cost Estimating in Building Information Modeling: Process Development Report Presentation: 0.1 CEU Dr. Tamera L. McCuen, Peter R Bredehoeft Jr CEP, 55 min 15 sec
(CDR-815) Forensic Schedule Analysis - Chapter 2: Delay Analysis on Non-CPM Scheduled Projects Presentation: 0.1 CEU James G. Zack, Jr. CFCC FAACE Hon. Life, Steven A. Collins , 60 min 26 sec
(CDR-842) Multi-Primes and Multiple Critical Paths Presentation: 0.1 CEU Mr John C Livengood CFCC PSP ARCADIS, 63 min 54 sec
(CDR-850) A Model for Construction Delays Claims Assessment Presentation: 0.1 CEU Sasan Golnaraghi, Sabah Alkass, P.Eng., 34 min 20 sec
(CDR-867) Estimating Escalation Experienced During Project Delay - A Case Study Presentation: 0.1 CEU William E Kraus PE FRICS CCE, 40 min 23 sec
(CDR-870) Forensic Schedule Analysis: Example Implementations, Part 3 Presentation: 0.1 CEU Mark C. Sanders, PE CFCC, 62 min 53 sec
(CDR-876) When's the Measured Mile, Not the Measured Mile? Presentation: 0.1 CEU Mark F Nagata PSP , Ms Elizabeth Bradford Trauner Consulting Services, Inc., 62 min 38 sec
(CDR-923) Recommended Contractual Methods for Resolving Delay Events Prospectively or Retrospectively Presentation: 0.1 CEU Mr Patrick M Kelly PE PSP, 52 min 14 sec
(CDR-948) Using the Measured Mile to Increase Calculated Delay Quantum Presentation: 0.1 CEU Glen R Palmer CFCC PSP, Mr Jeffery L. Ottesen PE CFCC PSP, 58 min 22 sec
(CDR-963) Case Study of a CM's QA/QC Performance Using the TCM Framework Presentation: 0.1 CEU Mr. William M. Hart PE CFCC PSP, 60 min 20 sec
(CDR-966) Creating Mid-Period Schedules in Window Analysis Using Primavera Version 6 Presentation: 0.1 CEU Mr Patrick M Kelly PE PSP, 61 min 25 sec
(CDR-974) When an Owner's Hard-Line Claims Negotiations are Also a Breach of Contract Presentation: 0.1 CEU Mr. Christopher J. Brasco, Mr. Adam M. Tuckman, 56 min 38 sec
(CDR-978) Evaluating Cost Escalation Using Cost-loaded Schedules Presentation: 0.1 CEU Mr. Sagar B. Khadka CCE PSP McDonough Bolyard Peck, Inc, Mr Christopher J Payne PE CFCC PSP McDonough Bolyard Peck, Inc, 55 min 10 sec
(CDR-980) Proving Engineering Productivity Loss Presentation: 0.1 CEU Dr. Tong Zhao, PE PSP, J. Mark Dungan, 54 min 4 sec
(CDR-1003) Proving the Hidden Costs of Acceleration Presentation: 0.1 CEU Mr Robert A Dieterle CCE Hill International Inc, Mr Thomas A Gaines CCC Hill International Inc, 49 min 23 sec
(CSC-816) Accepted Standards and Emerging Trends in Over Target Baseline (OTB) Contracts Presentation: 0.1 CEU Simon Dekker, 41 min 10 sec
(CSC-834) RP 60R-10: Developing the Project Controls Plan Presentation: 0.1 CEU H Lance Stephenson CCC, 59 min 31 sec
(CSC-847) Recommended Approach to Offshore Cost and Schedule Benchmarking Presentation: 0.1 CEU Aileen Anne Jamieson, 52 min 21 sec
(CSC-889) Designing to Budget: New Mississippi River Bridge Case Study Presentation: 0.1 CEU Kelly Strong, 41 min 21 sec
(CSC-929) Construction Schedules for Better Cash Flow Management Presentation: 0.1 CEU Pete A Bassford PSP, Brian C Smith CCC, 57 min 0 sec
(CSC-990) Change Management for Entry-Level Cost Control Professionals Presentation: 0.1 CEU Gregory James Whiteside CCT, 45 min 3 sec