(EST-1648) Cost Estimating for Offshore Oil & Gas Facility Decommissioning Presentation: 0.1 CEU Dr. Robert C. Byrd PE, Donald J. Miller, Steven M. Wiese, 56 min 20 sec
(EST-1681) (Panel Discussion) Construction Cost Estimating: Challenges and Opportunities Presentation: 0.1 CEU Michael R. Morrison, CCP, Douglas W. Leo, CCP CEP FAACE Hon. Life, Larry R. Dysert, CCP CEP DRMP FAACE Hon. Life, Carlton W. Karlik, CEP, 71 min 6 sec
(EVM-1552) Planning for EVM within Basic Project Controls Deliverables Presentation: 0.1 CEU Dr. Peerapong Aramvareekul, EVP PSP, Ronnie D. Stephens, 54 min 12 sec
(EVM-1556) Why Earned Value Metrics Sometimes Deceive Management Presentation: 0.1 CEU Thomas W. Jaeger EVP, 54 min 20 sec
(EVM-1636) Earned Value in the Oil and Gas Industry Presentation: 0.1 CEU Marlene M. Hyde CCP EVP, Nicholas L. Kellar CCP EVP PSP, 55 min 44 sec
(EVM-1649) Cost and Schedule Reserves in a Project Baseline, an Owners and Contactor’s Perspective Presentation: 0.1 CEU Dan Melamed CCP EVP , Robert Loop EVP PSP, 58 min 57 sec
(EVM-1747) Effective Use of Earned Value for Controlling Construction Projects Presentation: 0.1 CEU Laurie S. Bowman CCP DRMP EVP PSP, Mina Sabouri PSP, 54 min 59 sec
(OWN-1507) Establishing Business Management System for Oil and Gas Projects Presentation: 0.1 CEU Sean T Regan CCP CEP, 61 min 8 sec
(OWN-1541) Can “Project Management Contractors (PCM)” Fill Owners’ Cost Engineering Needs for Major Capital Projects? Presentation: 0.1 CEU Stephen L. Cabano, Paul G. Williams, 57 min 1 sec
(OWN-1547) Improving Owner’s Cost Estimating Processes and Practices – NOC Perspective Presentation: 0.1 CEU Mr. Johnson Olugbelenke Awoyomi CCP, 61 min 32 sec
(OWN-1549) Remote Site Camp Costs Optimization for Mega Oil/Gas Projects Presentation: 0.1 CEU Yuhong (Tony) Wu, CCP, Dr. Ming Lu, 58 min 14 sec
(OWN-1560) Oil & Gas Reimbursable Construction Contracts Cost Management -- An Owner’s Perspective Presentation: 0.1 CEU Mr. Moses Yaw Nkuah FRICS CCP, 60 min 9 sec
(OWN-1566) Public Construction Projects -- Failures in Forecasting: Honest Mistakes… and Otherwise Presentation: 0.1 CEU Mr. William M. Hart PE CFCC PSP, 56 min 1 sec
(OWN-1592) Owner’s Guidelines for Specifying Schedule Deliverables from EPC Contractors Presentation: 0.1 CEU Mr. Himansu Bhaumik PE, 67 min 46 sec
(OWN-1670) Integrated Project Reporting Using Dashboards: Harnessing the Power of Primavera P6 Presentation: 0.1 CEU John W. Blodgett, Brian Criss, PSP, 67 min 14 sec
(PM-1492) Vital Signs of a Healthy Project Management Environment Presentation: 0.1 CEU Vittal S. Anantatmula and Dr. Parviz F. Rad PE CCP, 63 min 23 sec
(PM-1525) Systems Engineering Methods Applied to Megaprojects: A Critique Presentation: 0.1 CEU Calvin J. Speight Jr. CCP, 45 min 42 sec
(PM-1671) Megaprojects: Insights for Not Losing Billions of Dollars Presentation: 0.1 CEU Rafael Gonalves Monteiro , Thiago Henriqe Rezende Medeiros, 42 min 56 sec
(PM-1674) Project Controls Support to Project Management Presentation: 0.1 CEU Dr. Mohamed E. El-Mehalawi, 50 min 43 sec
(PM-1744) Today’s Buzz Words -- Optimism Bias Presentation: 0.1 CEU J. Michael Devine CCP, 61 min 14 sec
(PS-1521) The Care and Feeding of P6 Databases, Part 2 Presentation: 0.1 CEU Ronald M Winter PSP, 62 min 41 sec
(PS-1548) Integrated Scheduling for Non-Schedulers Presentation: 0.1 CEU Brandon Atkins, PE, 50 min 25 sec