(CDR-1815) Forensic Schedule Analysis and Discretionary Logic Presentation: 0.1 CEU Mr John C Livengood CCP CFCC PSP , 59 min 12 sec
(CDR-1868) Changing Trend in Risk Allocation - Differing Site Conditions Presentation: 0.1 CEU Mr James G Zack Jr CFCC, Steven A. Collins , 67 min 23 sec
(CDR-1878) US Major Task Order Contracting and NZ Collaborative Alliances Comparison Presentation: 0.1 CEU Mr Jorge Andres Rueda-Benavides, Dr Eric Scheepbouwer, Dr. Douglas D Gransberg, PE, CCP , 35 min 37 sec
(CDR-1920) Minimizing Financial Losses Using Builder’s Risk Insurance Presentation: 0.1 CEU Dayna L. Anderson , Mr Seth D Lamden, 66 min 32 sec
(CDR-1967) Determining the Measured Mile for Lost Productivity Claims Presentation: 0.1 CEU Dr. Tong Zhao, PE PSP, J. Mark Dungan, 51 min 0 sec
(CDR-1997) An Improved Measured Mile Methodology for Heavily Disrupted Projects Presentation: 0.1 CEU Mr Nelson Gallardo , 50 min 33 sec
(CDR-2047) Unified Evaluation Criteria for Delay and Productivity Analyses Presentation: 0.1 CEU Mr Kenji P Hoshino CFCC PSP , 59 min 43 sec
(CSC-1842) Cost Increases in the Front-End of Road Projects Presentation: 0.1 CEU Morten Welde, James Odeck, Geir Saxebol, 63 min 14 sec
(CSC-1844) Causes of Commissioning Delays in Industrial Projects in Saudi Arabia Presentation: 0.1 CEU Dr Ali A Shash, Asadullah Khan, 31 min 12 sec
(CSC-1851) Drones for Project Controls and Other Uses on Construction Projects Presentation: 0.1 CEU Paul Levin PSP, 54 min 42 sec
(CSC-1872) Value of Work Done: Measurement for Oil and Gas Project Presentation: 0.1 CEU Dileezaa Lurthanathan, Rahmah Idris, 54 min 24 sec
(CSC-1918) Pacing as a Delay Management Mechanism Presentation: 0.1 CEU Dr. Amin Terouhid, DRMP PSP, Diana Minchella, Andrew Lawrence Sargent, 56 min 3 sec
(CSC-1925) Understanding Contractor Project Controls Capability through Request for Proposal Questionnaire Presentation: 0.1 CEU Julie Richards, 57 min 21 sec
(CSC-1937) Contingency Drawdown Forecasting, Tracking, and Actual Contingency Spend Forecasting Presentation: 0.1 CEU Robert J. White, 60 min 38 sec
(CSC-1938) Re-Assessing KPIs and Trend Charts for Staff, PMs and Stakeholders Presentation: 0.1 CEU Mark Stillman, John Norwood, 38 min 10 sec
(CSC-1986) Using Theoretical S-Curve to Forecast Project Duration Considering Past Performance Presentation: 0.1 CEU Rafael Gonalves Monteiro, Vinicius Oliveira Daher, 49 min 13 sec
(CSC-2040) Scope Decomposition for Cost and Schedule Integration Presentation: 0.1 CEU Rohit Singh, P.Eng. CCP, William Manuel Diaz, 50 min 36 sec
(DEV-2021) Leading Project Controls as a Seconded Employee on a Non-Operated Joint Venture Presentation: 0.1 CEU Gregory J. Whiteside CCP, 57 min 20 sec
(EST-1838) The Evolution of Public Works Contracting in Brazil Presentation: 0.1 CEU Tatiana Thome de Oliveira, Paulo Roberto Kozlowski Tannenbaum Filho, Sergio Rodovalho Pereira, 49 min 51 sec
(EST-1841) The Impact of Cost Estimation Methodologies on Cost Overruns Presentation: 0.1 CEU Morten Welde, James Odeck, Geir Saxebol, 59 min 45 sec
(EST-1852) Identifying Key Cost Drivers of Well Abandonment Utilizing Regression Analysis Presentation: 0.1 CEU John R Parson CCT CCP, Adam Pieknik, 48 min 49 sec
(EST-1916) Regression-Based Estimation of Material Quantities Using Case-Based Reasoning Presentation: 0.1 CEU Dr Borja Garcia de Soto PE, Bryan T Adey, 40 min 20 sec
(BIM-1926) Strategies for BIM Adoption Presentation: 0.1 CEU Dr Ralph Kreider, Robert Fraga , 63 min 13 sec