(EST-4062) Using Case Based Reasoning to Improve Top-Down Estimate Accuracy Presentation: 0.1 CEU Dr. Nils J. Gransberg, Saf'a Maraqa, Beau Solimando, 60 min 15 sec
(EST-4104) FY2022 Department of Energy Project Management Escalation Study for Capital Assets Presentation: 0.1 CEU Matthew Zachary West, Dipali R. Amin, 55 min 5 sec
(EST-4120) Project Code of Accounts - Enhanced by Adding Construction or Environmental Remediation Industry Standards Presentation: 0.1 CEU Corey Clemmons, Dan Melamed, CCP EVP FAACE, Bryan A. Skokan, PE CCP, Jake Lefman, Rodney Lehman, 46 min 32 sec
(EST-4129) Utilization of Internal Cost Benchmarking in EPC Bidding Presentation: 0.1 CEU Mu Chen, CCP, 58 min 42 sec
(EST-4160) (Presentation Only) Material Increase, Supply-Chain Issues, and Market Volatility Impacts Presentation: 0.1 CEU Peter R. Bredehoeft, Jr. CEP FAACE, 54 min 27 sec
(EST-4191) (Presentation Only) Common Misapplication of Estimate Classification RPs Presentation: 0.1 CEU Larry R. Dysert, CCP CEP DRMP FAACE Hon.Life, 72 min 7 sec
(EVM-4025) Fully Integrating Earned Value and CPM Schedule Analysis at a Causal Level - A New Analytical Approach Presentation: 0.1 CEU J. Gerard Boyle, CFCC, 61 min 11 sec
(EVM-4050) Effectiveness of the Earned Schedule vs. the Earned Value Presentation: 0.1 CEU Keight Charles Navarro Hurtado, PSP, 51 min 22 sec
(EVM-4080) Using Earned Value and Parametric Methods to Estimate Remaining Costs of Construction Presentation: 0.1 CEU Glauco Bezerra da Silva, 30 min 32 sec
(EVM-4093) Use of Duration-Day Resource Earned Value to Monitor Performance Presentation: 0.1 CEU Christopher W. Carson, CEP DRMP PSP FAACE, Andrew Dick, PSP, 52 min 18 sec
(EVM-4133) Comparing Different Methods of Performance Measurement for Earned Value for Linear Infrastructure Industry with Recommendation Presentation: 0.1 CEU Abbas Saifi, CCP EVP PSP, 61 min 35 sec
(EVM-4159) A Case Study on Implementing the Integrated Project/Program Management Maturity and Environment Total Risk Rating using an Earned Value Management System Presentation: 0.1 CEU Melvin G. Frank, Hala Sanboskani, David Kester, Mounir El Asmar, Dr. G. Edward Gibson, Jr., Matthew Z. West, 61 min 1 sec
(INT-4030) Logistic Challenges in Large-Sized Theme Park Projects in China and An Appropriate Management Model Presentation: 0.1 CEU Lan Zhang, Tianqi Xiong, Renjun Luo , 31 min 53 sec
(INT-4035) Challenges of Contractor's Management Organization for a Large Semiconductor Project in China Presentation: 0.1 CEU Lan Zhang, Jian Chen, Jiang Lu , 38 min 29 sec
(IT-4095) Bidding Process Budget and Proposals Comparative Analysis Presentation: 0.1 CEU Leandro André, Vitor dos Santos Borré , 49 min 30 sec
(OWN-3987) Main Considerations for Design and Implementation of Project Management Guidelines for Owner Companies Presentation: 0.1 CEU Reza Shahran, Abbas Shakourifar, PSP, 53 min 32 sec
(OWN-4031) Implementing a Data-Driven Method to Reduce Deferred Maintenance and Repair Presentation: 0.1 CEU Avi Schwartz, Jodie Kim, PE, Eric Dembert, Yue Ou, Brandon Billy, Brendan Hurley, 62 min 19 sec
(OWN-4056) Project Control for Owners' Small Project Portfolios Presentation: 0.1 CEU Stephen L. Cabano, FAACE, 59 min 55 sec
(OWN-4146) Project Controls Plan - Owner's Perspective Presentation: 0.1 CEU Syd Daneshyar, P.Eng. CCP, 55 min 46 sec
(OWN-4166) Project Contingency Forecasting - Owner's Perspective Presentation: 0.1 CEU Rajmohan Mishra, 59 min 58 sec
(OWN-4168) Enhancing the Control and Quality of Process Piping Manufacturing Presentation: 0.1 CEU Ghassan Al-Dossary, CCP, Abdullah Y. Saleh, Mohammed S. Alghamdi, Hussain A. Al-Omani, CCP CEP DRMP EVP PSP, 40 min 48 sec
(PM-4045) Applying Influential Behaviors on Non-Operated Joint Venture Projects Presentation: 0.1 CEU Claudette Richard-Smith, 48 min 15 sec
(PM-4071) An Overview of Hydropower Construction Projects in Canada and Lessons Learned Presentation: 0.1 CEU Ali Montaser, P.Eng. CCP EVP PSP, Ahmed Montaser, EVP, 61 min 52 sec
(PM-4090) Last Line of Defense: Integration of Quality Control Initiatives With Project Controls for More Predictable Outcomes Presentation: 0.1 CEU Sedat Akkaya, Krishan Mittal, P.Eng., Noor Al-Shaikh, 53 min 22 sec