(CDR-4123) The Schedule Delay Analysis for Subcontractors - Different by Necessity Presentation: 0.1 CEU Charles E. Bolyard, Jr. CFCC PSP FAACE Hon. Life, Laura Freas, 52 min 42 sec
(CDR-4138) The Theory of Delay: Timing and Basis for Identifying and Measuring Delay Presentation: 0.1 CEU Mark C. Sanders, PE CCP CFCC PSP, 67 min 26 sec
(CDR-4156) Construction Claim Work Book for Forensic Analysis Presentation: 0.1 CEU Dr. Wael El Ghandour, 49 min 14 sec
(CDR-4158) Schedule Delay Analysis in a Multi-Prime Environment Presentation: 0.1 CEU Joseph W. Wallwork, PE CCP CFCC PSP, Matthew A. Street, PSP, Eric J. Wallwork, 56 min 39 sec
(CSC-4005) Field Overhead - Direct or Indirect Cost and the Proper Use of NAVFAC Form 4330/43 Presentation: 0.1 CEU Nickolas Florez, CFCC, 36 min 19 sec
(CSC-4023) (Panel Discussion) Project Controls - A Profession on the Edge of Extinction or Rebirth? Presentation: 0.1 CEU Kim D. Forbes, PSP, Ghaith Al-Hiyari, CCP, Carlos Ortega, Lucia Vernon, Duan van der Merwe (Moderator), 62 min 48 sec
(CSC-4074) Contingency Drawdown and the Roadmap to the Project Cost at Completion Presentation: 0.1 CEU Ghaith Al-Hiyari, CCP, Bahy Saleh, CCP PRMP, Sedat Akkaya, 60 min 51 sec
(CSC-4102) Why Large Capital Projects Are Too Often Over Budget and What to Do About It? Presentation: 0.1 CEU Glen R. Palmer, CFCC PSP FAACE, Dr. Lev Virine, P.Eng., 65 min 45 sec
(CSC-4122) Major Project Execution Cost Forecasting - Back to Basics Presentation: 0.1 CEU Moses Y. Nkuah, CCP EVP, 62 min 0 sec
(CSC-4154) Controlling Small Projects Presentation: 0.1 CEU Sudhakar R. Pulagam, P.Eng. CCP EVP, 49 min 13 sec
(DEV-4028) (Panel Discussion) Women in Project Controls: Friend, Foe or Bystander Presentation: 0.1 CEU Shoshanna Fraizinger, CCP, Nicole Johnson, CEP, Dr. Rania Fayed , Tracy Leung, P.Eng. (Moderator), 62 min 58 sec
(DEV-4033) Best Practices in Implementing Emerging Technologies in Construction Controls Presentation: 0.1 CEU Ben Milner, Dr. Bahadir V. Barbarosoglu, CCP EVP PSP, 52 min 26 sec
(DEV-4077) The Evolution to Well-Rounded Project Controls Professionals in Aviation Presentation: 0.1 CEU Dana N. Rutledge, 45 min 35 sec
(DEV-4161) (Panel Discussion) Rising Career Stories in Planning & Scheduling Presentation: 0.1 CEU Jessica M. Colbert, PRMP PSP, Matthew Freih, PE PSP, Daniel P. Gilmour, PSP, Avi Sharma, Matthew Pringle, PSP (Moderator), 57 min 23 sec
(DEV-4195) (Presentation Only) Statistics and Probability for Cost Engineers Presentation: 0.1 CEU Larry R. Dysert, CCP CEP DRMP FAACE Hon. Life, 58 min 2 sec
(DSAA-4001) Lean Operating Systems - Project and Portfolio Management Data Visualization Using Integrated Reporting Presentation: 0.1 CEU John W. Blodgett, Bria Goggins, Erica Sinkey, Randy Smith, 60 min 42 sec
(DSAA-4064) Artificial Intelligence & Machine Learning Impact on Robust Project Control Improvement in Portfolio Management Presentation: 0.1 CEU Muhammad Azri Ahmad Baharom, Mohd Shahrizan Abd Rahman, 41 min 50 sec
(DSAA-4094) Integrated Real-Time Location System Information and 3D Point Clouds for Object Localization Onsite Using Deep Neural Networks Presentation: 0.1 CEU Hassan Bardareh, Dr. Osama El Sayed Moselhi, P.Eng. FAACE, 58 min 47 sec
(DSAA-4101) Data-Driven Schedule Risk Forecasting for Construction Mega-Projects Presentation: 0.1 CEU Vahan Hovhannisyan, Peter Zachares, Alan Mosca, Yael Grushka-Cockayne, Carlos Ledezma , 59 min 29 sec
(DSAA-4109) A Milestone in a Digital Transformation Journey: Implementation of ISO 19008 Taxonomy as Part of Chevron's Cost Engineering Data Transformation Presentation: 0.1 CEU Emily Smith, Abbas Shakourifar, PSP, 51 min 6 sec
(DSAA-4162) Insights on Project Performance from 500,000 Projects Presentation: 0.1 CEU Dev Amratia, Richard Bendall-Jones, Taylor Burns, Gerard Cardoso Negrie , 52 min 11 sec
(DSAA-4192) (Panel Discussion) AI in Project Controls and Forensic Analysis Presentation: 0.1 CEU Kenji P. Hoshino, CFCC PSP FAACE, Dev Amratia, Daniel P. Gilmour, PSP, Patricia Kusumadjaja, CEP, Lucia Vernon, Avi Sharma (Moderator), 60 min 16 sec
(EST-3995) (Presentation Only) Uncovering the Mystery: Dialing in the Productivity Impact to Project Field Labor Cost Presentation: 0.1 CEU Christopher L. Kinney , 61 min 40 sec
(EST-4013) Confronting Price Escalation and Volatility Issues with Construction Materials Presentation: 0.1 CEU Neil D. Opfer, CCP CEP PSP FAACE, 60 min 54 sec
(EST-4016) Does Historical Data on Unique Government Nuclear Facilities Have an Expiration Date? Presentation: 0.1 CEU Robert G. Fatzinger, CEP, Alfred G. Levinson, 54 min 9 sec