(ADV-3966) Optimization of Procurement in the Construction Industry: What Todays Environment Has Taught Us Presentation: 0.1 CEU Robert Raynes, 53 min 4 sec
(BIM-3967) 5D Planning in Earthworks Mining Constructions in Hilly Topography Presentation: 0.1 CEU Axel Franco Castro Cuadra, Franco Manuel Sánchez Romero, CCP, Julio Cesar Velasco Alvarez, Christian Chinchay Rios, 52 min 5 sec
(BIM-4057) Leveraging BIM, Automation, and Machine Learning for Future Cost Assessment of Energy Conservation Measures Presentation: 0.1 CEU Patricia Kusumadjaja, CEP, 42 min 35 sec
(BIM-4065) Key Benefits of 4D BIM Scheduling Implementation in Oil & Gas Projects and the Challenges Presentation: 0.1 CEU Muhammad Azri Ahmad Baharom, Khairul Hafiz Zolkipli, Rodzleana Abdul Razak , 52 min 3 sec
(BIM-4081) (Presentation Only) Building Information Modeling: Not just Clash Detection Anymore Presentation: 0.1 CEU Michael Danish, EVP PSP, Michael F. Marcell, EVP PSP , 62 min 57 sec
(BIM-4087) BIM and VE Optimization for Construction Schedule and Cost Control Presentation: 0.1 CEU Dr. Kwame B.O. Amoah, 54 min 41 sec
(BIM-4116) Integration of BIM, CPM Schedule, Short Interval Planning, Schedule Animation, and Progress on Fast Track Projects Presentation: 0.1 CEU Britton L. Wolf, Martin Figlarz, Tyler C. Simches , 53 min 23 sec
(CDR-3955) Assessing Contractor Responsible Concurrency When Using MIP 3.3 - Can a Sensible Procedure be Developed? Presentation: 0.1 CEU Ronald J. Rider, Dr. Stephen P. Warhoe, PE CCP CFCC FAACE Hon. Life, 54 min 6 sec
(CDR-3963) Pitfalls to Avoid When Quantifying Extended Field Office Overhead Costs Presentation: 0.1 CEU Suleiman Al Rai, PE PSP, Cory R. Milburn, CCP CFCC PSP, 38 min 24 sec
(CDR-3968) Validating Change Order Requests for Forensic Analysis Presentation: 0.1 CEU David Carlson, Keefe Mulligan, Khaled Alhamouri , 32 min 42 sec
(CDR-3977) A Primer for Claims and Disputes (Claims 101) Presentation: 0.1 CEU John J. Ciccarelli, PE CCP PSP FAACE, Erin M. Fallon, CCP PSP, 63 min 39 sec
(CDR-3997) Advanced Measured Mile Method Using GMM Presentation: 0.1 CEU Dr. Wael El Ghandour, Brahim Seddiki, Belkacem Foura, 58 min 4 sec
(CDR-4026) The Hybrid Earned Value Analysis - A Proxy for the Measured Mile Presentation: 0.1 CEU Ryan N. Witters, Russell H. Wodiska, EVP, 62 min 32 sec
(CDR-4027) The Risk of Mitigation - A Case Study of the Impact of Contemporaneously Changing Logic Presentation: 0.1 CEU Brenton J. Sadauskas, PSP, Russell H. Wodiska, EVP, 63 min 17 sec
(CDR-4037) Forensic Delay Analysis of Disrupted Projects: An Alternative Approach Using System Dynamics Presentation: 0.1 CEU Alexander Voigt, Moneer S. Khalaf, Dr. Sam G. Mattar, 60 min 46 sec
(CDR-4051) Assigning As-Planned Gains-Delays in MIP 3.4, Split Contemporaneous Period Analysis Presentation: 0.1 CEU Christopher W. Carson, CEP DRMP PSP FAACE, John J. Ciccarelli, PE CCP PSP FAACE, Kenji P. Hoshino, CFCC PSP FAACE, Greta A. Martin, PE PSP, Mark F. Nagata, PSP, 70 min 42 sec
(CDR-4055) Total Cost Claim Versus Global Claim in Construction Claims Presentation: 0.1 CEU Dr. Tong Zhao, PE CCP CFCC PSP, Robert B. Cavoto , 58 min 17 sec
(CDR-4059) Benefits for Dispute Boards with the Application of AACE International Recommended Practices Presentation: 0.1 CEU Luis Otavio Rosa, 59 min 43 sec
(CDR-4068) Legal Pitfalls of the "Windows" Delay Analysis Method Presentation: 0.1 CEU Ahmed Y. El Sayed, Dr. Waleed M. El Nemr, Khalid S. Al-Gahtani , 46 min 22 sec
(CDR-4072) Combining Equipment Production Analysis and Delay Analysis to Quantify Time and Cost Impacts Presentation: 0.1 CEU Michelle McMillan, P.Eng., Nawfal Merzouk, P.Eng., 57 min 44 sec
(CDR-4082) Schedule Updates Using Remaining Original Duration versus Remaining Work Duration Presentation: 0.1 CEU Thomas C. Long, 64 min 1 sec
(CDR-4098) The Engineer/Initial Decision Maker's Role in Adjudicating Claims under FIDIC 2017 and AIA232-2019 Contracts Presentation: 0.1 CEU Dr. Rania Fayed, Dr. Waleed M. El Nemr, 56 min 59 sec
(CDR-4105) Assessing the Reasonableness and Reliability of CPM Schedules for Use in Forensic Schedule Analyses Presentation: 0.1 CEU Brian Celeste, CCP CFCC PSP, Andrew Leavitt, CCT CST, 59 min 2 sec
(CDR-4111) Maximizing Early Claims Resolution Success through Contemporaneous Project Data Capture Presentation: 0.1 CEU Kristin Glavitsch, 61 min 7 sec
(CDR-4121) Death by a Thousand Cuts: Cumulative Impact Claims Presentation: 0.1 CEU Colleen Lenz, David M. Ponte, PE CFCC, 61 min 25 sec