(RISK-2878) Simple Risk Policy as a Utility Function Presentation: 0.1 CEU John R. Schuyler, PE CCP DRMP, 51 min 40 sec
(RISK-2890) Journey-Map to a More Mature Schedule Risk Analysis (SRA) Process Presentation: 0.1 CEU Dr. David T. Hulett, FAACE, 71 min 10 sec
(RISK-2891) The Art of Strategic Written Criticism to Effectively Mitigate Risk Presentation: 0.1 CEU Shawn M. Paroline, Ramon A. Ruelas, Devang B. Dedhia, PSP, 60 min 37 sec
(RISK-2926) Project Controls & Data Analytics in the Era of Industry 4.0 Presentation: 0.1 CEU James E. Arrow, DRMP, Arvid Markhus, Vijai Singh, Cesar Ramos, Stefan Bakker, 63 min 17 sec
(RISK-2929) Improving Risk Management Effectiveness by Testing Risk Relevance Presentation: 0.1 CEU James E. Arrow, DRMP, 58 min 36 sec
(RISK-2930) Panel Discussion - DRM Subcommittee - Developing DRM Skills & Knowledge Presentation: 0.1 CEU James E. Arrow, DRMP, Dr. David T. Hulett FAACE, H. Lance Stephenson, CCP FAACE, 68 min 39 sec
(RISK-2932) Utilizing a QRA Maturity Model for Continuous Improvement Presentation: 0.1 CEU James E. Arrow, DRMP, 54 min 13 sec
(RISK-2946) Oil & Gas Plant Project Activities Parallelization Presentation: 0.1 CEU Francesco Cau, Franco Caron, Giambattista De Ghetto, Filippo Fratoni, Marika Guerra, 63 min 16 sec
(RISK-2947) Probabilistic Inference and Elicitation of Structured Expert Knowledge in Industrial Megaprojects Presentation: 0.1 CEU Pouya Zangeneh, P.Eng., Dr. Brenda McCabe, P.Eng., Murray Pearson, P.Eng., Nick Mason, 54 min 14 sec
(SK-3012) Presentation Only - An Appreciation of Soft Skills Applied to Cost Engineering Presentation: 0.1 CEU Martin R. Darley, CCP FAACE, 60 min 15 sec
(SK-3013) Presentation Only - Planning & Scheduling Fundamentals Presentation: 0.1 CEU Steve Feng, Julianne Richards, PSP, 61 min 7 sec
(SK-3015) Presentation Only - Data Analysis and Reporting with Power BI Presentation: 0.1 CEU Steve Feng, 51 min 35 sec
(SK-3016) Presentation Only - Implementation of an EVM System Presentation: 0.1 CEU Michael R. Nosbisch, CCP PSP FAACE, 62 min 47 sec
(SK-3017) Presentation Only - Intelligent Project Forecasting Using Earned Value Extensions of The Traditional EVM S-Curve Graph Presentation: 0.1 CEU Michael Bensussen, 56 min 0 sec
(TCM-2771) Industrial Engineering, Management Science, and the Future of Project Controls Presentation: 0.1 CEU Dr. Alexia A. Nalewaik, CCP FAACE, 40 min 15 sec
(TCM-2830) Cost Control of Crude Oil Production Costs – NOC’s Perspectives Presentation: 0.1 CEU Johnson O. Awoyomi, CCP CEP, 51 min 8 sec
(TCM-2885) Benchmarking Cost Performance of Heavy Industrial Construction Projects Presentation: 0.1 CEU Mihai Robu, Dr. George F. Jergeas, P.Eng., Dr. Farnaz Sadeghpour, 60 min 27 sec
(TCM-2952) Life-Cycle Cost Analysis for Concrete Pavement Structures Presentation: 0.1 CEU Dr. Robert L. Schmitt, PE, Dr. Samuel Owusu-Ababio, PE, 46 min 1 sec
(TCM-2957) Optimization of Team Mix to Reduce Cost and Increase Profitability in Projects and Bids Presentation: 0.1 CEU Dr. Kamran Hazini, P.Eng. CCP PSP, 65 min 41 sec
(TCM-3003) Panel Discussion - Contractor Best Practices Forum Presentation: 0.1 CEU Phil Peterson, PSP, Adam T. Althoff, PSP, Kenneth A. McBroom, PSP, Janet Bradford, PSP, 59 min 2 sec
(TCM-3004) Panel Discussion - Owner Best Practices Forum Presentation: 0.1 CEU Larry R. Dysert, CCP CEP DRMP FAACE Hon. Life, Prashant K. Srivastava, Dave Kyle, CEP, Valerie G. Venters, CCP FAACE, Julie K. Owen, CCP PSP, Kurt W. Winkel, CEP PSP, 62 min 0 sec