(BIM-2854) Novel Single-side Suspension Footbridge: BIM, IPD and Cost Control Case Study Presentation: 0.1 CEU Xuelei Pang, Chao Yu, Mengjie Chu, 64 min 19 sec
(BIM-2939) Panel Discussion: Capital Project Delivery - Innovation Collaboration Forum Presentation: 0.1 CEU Julie K. Owen, CCP PSP FAACE, Mark von Leffern EVP PSP, H. Lance Stephenson, CCP FAACE, Kenneth A. McBroom, PSP, Andy Kayhanfar, 57 min 38 sec
(CDR-2766) Unraveling the Complexities of Construction Fraud Presentation: 0.1 CEU Dayna L. Anderson , Sashi A. Mahtani, CCP, 55 min 36 sec
(CDR-2769) Daily Effect in Extension of Time Claims Presentation: 0.1 CEU Carlos Seoane Dopazo, Javier Trapero Pérez, 49 min 7 sec
(CDR-2792) Using the Half-Step Technique in Retrospectively Analyzing Schedule Delay Presentation: 0.1 CEU Robert M. Freas, Muhammad Khedr, PSP, 56 min 37 sec
(CDR-2803) An Egyptian Owner's Perspective on the “Missing Bill of Quantities Items” Phenomenon in Unit Price Contracts Presentation: 0.1 CEU Dr. Waleed M. El Nemr, Ahmed S. Afifi, 57 min 40 sec
(CDR-2807) Application of Liquidated Damages When the Completion Date is Unknown - Insight from an Egyptian Perspective Presentation: 0.1 CEU Dr. Waleed M. El Nemr, Amr Seddik, 53 min 35 sec
(CDR-2812) Trends in Construction Technology – The Potential Impact on Project Management & Construction Claims Presentation: 0.1 CEU Harold G. Dorbin, CFCC, Benjamin Woolley, James G. Zack, Jr. CFCC FAACE Hon. Life, 67 min 24 sec
(CDR-2818) Criticism of the ASCE Schedule Delay Analysis Offsetting Delay Concept Presentation: 0.1 CEU Mark F. Nagata, PSP, 62 min 48 sec
(CDR-2837) Introduction to Claims Management Guideline Presentation: 0.1 CEU Joseph L. Seibold, PE, Christi Fu, 63 min 38 sec
(CDR-2838) Forensic Schedule Diagnostics to Support Selecting a Methodology in AACE RP29R-03, Forensic Schedule Analysis Presentation: 0.1 CEU Jerry L. Vogt, PSP, 67 min 51 sec
(CDR-2845) Comparison of the AACE International and ASCE Forensic Scheduling Consensus Documents Presentation: 0.1 CEU Mark C. Sanders, PE CFCC, 64 min 27 sec
(CDR-2849) Time Impact Analysis in Windows - Concurrency Analysis Presentation: 0.1 CEU Lucia Vernon, 57 min 49 sec
(CDR-2864) An Effective Approach to Delay Analysis when Schedule Updates are Missing Presentation: 0.1 CEU Emad Mofarej Kouchaki, CCP PSP, Christopher W. Carson, CEP DRMP PSP FAACE, 59 min 8 sec
(CDR-2887) SCL Delay and Disruption Protocol 2nd ed. as Compared to AACE RP29R-03 Presentation: 0.1 CEU John C. Livengood, CCP CFCC PSP FAACE, 61 min 30 sec
(CDR-2936) The Impacted As-Planned Methodology (MIP 3.6) – Suitability and Application in Delay Analysis Presentation: 0.1 CEU Walied Abdeldayem, 58 min 58 sec
(CDR-2954) Proper Application of TIAs to Measure Delays on Government Projects Presentation: 0.1 CEU Michael P. Ryan, PE PSP, Bryan Van Lenten, PE, 62 min 54 sec
(CDR-2963) The Why, When, and How of a Productivity Claim Presentation: 0.1 CEU Joel A. Velasco, Maria Petrov, PE CFCC, 47 min 32 sec
(CDR-2966) Primavera's Float Path Calculation: Review and Analysis of Applications Presentation: 0.1 CEU Patrick M. Kelly, PE PSP, Roger Nelson, PE PSP, 56 min 43 sec
(CSC-2815) Using Document Management Workflow for Measuring Performance of Project Engineering Presentation: 0.1 CEU Definia Richardson, Dr. Mohamed E. El-Mehalawi, 53 min 39 sec
(CSC-2826) The Ten Commandments of Risk-Based Project Controls Presentation: 0.1 CEU Richard C. Plumery, EVP , 60 min 35 sec
(CSC-2831) Schedule and Cost Management of Subcontracts Presentation: 0.1 CEU A. Hagire Emrani, Syd Daneshyar, P.Eng. CCP, 42 min 56 sec
(CSC-2850) Scope Changes Impact on Construction Labor Performance Index Presentation: 0.1 CEU Hani S. H. Alzraiee, Dr. Osama El Sayed Moselhi P Eng , 58 min 56 sec
(CSC-2855) Integrated Cost and Schedule Model for Shipbuilding Projects Presentation: 0.1 CEU Ahmad Emam, CCP, 62 min 48 sec
(CSC-2879) Construction Labor Productivity Loss in Cleanroom Conditions: A Case Study Presentation: 0.1 CEU John D. Borcherding, Dr. James T. O'Connor, Jeyoung Woo, 35 min 59 sec