(BIM-2558) Building Information Modeling for Infrastructure Projects–Emphasis on 4D, 5D and 6D Presentation: 0.1 CEU Jignesh S. Shah, PE CCP EVP, 59 min 45 sec
(BIM-2569) Housing Price Estimation Using Statistical Methods and GIS Technology Presentation: 0.1 CEU Dr. Satish B. Mohan, Dr. Alan Hutson, 42 min 4 sec
(BIM-2632) Infrastructure: Visualizing Project Success Presentation: 0.1 CEU Connor Christian, Andy Kayhanfar, 57 min 11 sec
(CDR-2402) Project Claims Avoidance for Owners Presentation: 0.1 CEU Christopher P Caddell PE CCE , Andrew J. Aston, 57 min 38 sec
(CDR-2417) Optimizing the Resolution of Disputes on Construction Projects Presentation: 0.1 CEU Lynn B. Larsen, CFCC, 58 min 41 sec
(CDR-2451) Principles of Mediation – Explained with Case Study Presentation: 0.1 CEU Avinash A. Gaikwad, 58 min 48 sec
(CDR-2452) Change Happens: Implications on Contract Administration Practice and Policy Presentation: 0.1 CEU Dr. George O. Okere, CCP, 49 min 12 sec
(CDR-2495) Overview of As-Planned versus As-Built Forensic Schedule Analysis: AACE® International Recommended Practice No. 29R-03 Forensic Schedule Analysis MIP 3.1 and 3.2 Presentation: 0.1 CEU Scott A. Galbraith, PE CFCC, Michael T. Siburt, PE CCP PSP, John C. Livengood, CCP CFCC PSP FAACE, 69 min 26 sec
(CDR-2499) Measured Mile Improvements in Pervasively Disrupted Projects Presentation: 0.1 CEU Dr. Tong Zhao, PE PSP, J. Mark Dungan, 38 min 25 sec
(CDR-2542) Forensic Schedule Analysis – Critical Path Method - Test & Evaluation Systems Presentation: 0.1 CEU Michael S. Dennis, CCP, Kenji P. Hoshino, CFCC PSP, Mr Patrick M Kelly PE PSP, Greta A. Martin, PE PSP, 54 min 22 sec
(CDR-2543) Proposed Format and Content for Subordinate Recommended Practice, 29R-03-3.X Presentation: 0.1 CEU Kenji P. Hoshino, CFCC PSP, Michael S. Dennis, CCP, Greta A. Martin, PE PSP, 62 min 58 sec
(CDR-2568) What’s in a Name? – Forensic Delay Methodologies Presentation: 0.1 CEU Roger Nelson, PE PSP, Bernard Ong, 41 min 7 sec
(CDR-2608) Hot Tubs and Other ADR Remedies for Disputes that Ail You Presentation: 0.1 CEU Kathleen Olden-Barnes, Mr. Christopher J. Brasco, George (Trip) Stewart, 56 min 52 sec
(CDR-2616) Global Construction Disputes Report 2016 - Don't Get Left Behind Presentation: 0.1 CEU Roy Cooper, PE, Brian Goodreau, PSP, 55 min 12 sec
(CDR-2620) The Contemporaneous Period Analysis - Split Methodology Forensic Delay, MIP 3.4 Presentation: 0.1 CEU Mark F Nagata PSP , Christopher W. Carson, CEP DRMP PSP FAACE, 73 min 25 sec
(CDR-2662) RP29R-03 MIP3.5 Observational / Dynamic / Modified or Recreated Presentation: 0.1 CEU Walied Abdeldayem, Mark C. Sanders PE CFCC, 60 min 57 sec
(CDR-2684) An Insight to Concurrent Delay Analysis Presentation: 0.1 CEU Devdas K Tamboli CCE PSP, Manoj Joshi, 45 min 31 sec
(CDR-2708) The Collapsed As-Built Windows Schedule Analysis Method Presentation: 0.1 CEU Andrew Avalon, PE PSP, Ronald J. Rider, 68 min 11 sec
(CSC-2436) The Ten Biggest Lies in Project Controls Presentation: 0.1 CEU Glen R Palmer CFCC PSP, Christopher W. Carson, CEP DRMP PSP FAACE, 62 min 16 sec
(CSC-2659) Proactive Trend and Change Management: Avoiding the Iceberg Effect Presentation: 0.1 CEU Leslie E. McMullan, FAACE, 54 min 8 sec
(CSC-2664) Extending Control Accounts Toward an Integrated Data Model Presentation: 0.1 CEU Michael Goggin, 59 min 50 sec
(CSC-2687) Change Control Procedure during Design Development of a Mega Transit Project Presentation: 0.1 CEU Amgad F. Fahmy, PE CCP PSP, 53 min 34 sec
(DEV-2431) Harnessing Leadership Skills in Project Management Presentation: 0.1 CEU Biju Jacob, 50 min 17 sec
(BIM-2506) Virtual Construction Management Presentation: 0.1 CEU Michel Guevremont, P.Eng. PSP, 50 min 54 sec